ENS 48807: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| facility = Global Nuclear Fuel - Americas
| facility = Global Nuclear Fuel - Americas
| Organization =  
| Organization =  
| license number = Snm-1097
| license number = SNM-1097
| region = 2
| region = 2
| state = North Carolina
| state = North Carolina
Line 16: Line 16:
| event date = 03/05/2013 08:45 EST
| event date = 03/05/2013 08:45 EST
| last update date = 03/05/2013
| last update date = 03/05/2013
| title = Sole Irofs Pressure Mat Did Not Function As Designed
| title = Sole Irofs Pressure Mat Did Not Function as Designed
| event text = During a post maintenance test of a sole IROFS (Item Relied On For Safety) in the scrap press area, it was discovered that a sole IROFS of a pressure mat did not function as designed. The pressure mat is designed to ensure operator presence. The clutch that would be disengaged when the pressure switch is not active failed to do so. The press was immediately shut down. Similar presses have also been shut down. Double contingency was maintained (Moderation and Mass). The sole IROFS is designed for prevention of a fire scenario. At no time was an unsafe condition present.
| event text = During a post maintenance test of a sole IROFS (Item Relied On For Safety) in the scrap press area, it was discovered that a sole IROFS of a pressure mat did not function as designed. The pressure mat is designed to ensure operator presence. The clutch that would be disengaged when the pressure switch is not active failed to do so. The press was immediately shut down. Similar presses have also been shut down. Double contingency was maintained (Moderation and Mass). The sole IROFS is designed for prevention of a fire scenario. At no time was an unsafe condition present.
There were no radiological or chemical hazards resulting from this event. The licensee is conducting an investigation to determine the cause of the failure.
There were no radiological or chemical hazards resulting from this event. The licensee is conducting an investigation to determine the cause of the failure.

Latest revision as of 19:13, 24 November 2018

ENS 48807 +/-
Where
Global Nuclear Fuel - Americas
Wilmington, North Carolina (NRC Region 2)
License number: SNM-1097
Reporting
Part 70 App A (A)(4)
Time - Person (Reporting Time:+-4.08 h-0.17 days <br />-0.0243 weeks <br />-0.00559 months <br />)
Opened: Scott Murray
09:40 Mar 5, 2013
NRC Officer: John Shoemaker
Last Updated: Mar 5, 2013
48807 - NRC Website
Loading map...