ENS 49721: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| facility = Nova Engineering And Environmental, Llc | | facility = Nova Engineering And Environmental, Llc | ||
| Organization = Georgia Radioactive Material Pgm | | Organization = Georgia Radioactive Material Pgm | ||
| license number = | | license number = GA 1323-1 | ||
| region = 1 | | region = 1 | ||
| state = Georgia | | state = Georgia | ||
Line 16: | Line 16: | ||
| event date = 01/13/2014 EST | | event date = 01/13/2014 EST | ||
| last update date = 01/14/2014 | | last update date = 01/14/2014 | ||
| title = Agreement State Report Involving | | title = Agreement State Report Involving a Stolen Troxler Moisture-Density Gauge | ||
| event text = The following information was received from the State of Georgia via email: | | event text = The following information was received from the State of Georgia via email: | ||
On January 13, 2014, NOVA Engineering and Environmental, LLC had a Troxler 3440 gauge stolen out of the bed of the truck. There have been a couple thefts at this site leading up to this incident (2075 Princeton Ave., College Park, Georgia). The truck was parked at an active construction site (new elementary school) and the vehicles are required to park some distance away from the construction. During [the] NOVA gauge operator time at the site he stated he saw the gauge in the bed of the truck and sometime later he left this site to go to another. Upon arrival, he realized the chain had been cut and the gauge box was gone. | On January 13, 2014, NOVA Engineering and Environmental, LLC had a Troxler 3440 gauge stolen out of the bed of the truck. There have been a couple thefts at this site leading up to this incident (2075 Princeton Ave., College Park, Georgia). The truck was parked at an active construction site (new elementary school) and the vehicles are required to park some distance away from the construction. During [the] NOVA gauge operator time at the site he stated he saw the gauge in the bed of the truck and sometime later he left this site to go to another. Upon arrival, he realized the chain had been cut and the gauge box was gone. |
Latest revision as of 18:10, 24 November 2018
Where | |
---|---|
Nova Engineering And Environmental, Llc Kennesaw, Georgia (NRC Region 1) | |
License number: | GA 1323-1 |
Organization: | Georgia Radioactive Material Pgm |
Reporting | |
Agreement State | |
Time - Person (Reporting Time:+34.98 h1.458 days <br />0.208 weeks <br />0.0479 months <br />) | |
Opened: | David Crowley 15:59 Jan 14, 2014 |
NRC Officer: | Steve Sandin |
Last Updated: | Jan 14, 2014 |