NRC Generic Letter 1978-31: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 14: | Line 14: | ||
| page count = 6 | | page count = 6 | ||
}} | }} | ||
{{#Wiki_filter:frx K:(c__UNITED STATES \-/ in .,NUCLEAR REGULATORY | {{#Wiki_filter:frx K:(c__UNITED STATES \-/ in ., NUCLEAR REGULATORY | ||
COMMISSION | |||
n g aWASHINGTON. | |||
ENCLOSURE NO. | D. C. 20555 August 9, 1978 ALL PWR LICENSEES Gentlemen: | ||
-2 -1:30 p.m.2:00 p.m.2:30 p.m.3:30 p.m.4:00 p.m.TECHNICAL SESSION I: J. P. Knight-Eddy Current Inspection Method Evaluation(Representative -Battelle Columbus)-Advanced ECT Probe Development(Representative -ZETEC, Inc.)-PNL Steam Generator-Tube Integrity Program(Representative -Pacific Northwest Laboratory)-Coffee Break --BNL Stress Corrosion Tests(Representative -Brookhaven National Laboratories)-DOE Chemical Cleaning Program(Representative -U. S. Department of Energy)September 8, | The Division of Operating Reactors, Office of Nuclear Reactor Regulation, has organized a two-day PWR Steam Generator Conference to be held at the Holiday Inn in Bethesda, Maryland on September | ||
-3 -1:30 p.m.-PANEL DISCUSSIONS: D. G. | 7 and 8, 1978. The purpose of the conference is to provide an oppor-tunity for industry, government, national laboratory, foreign, and possible public representatives to present and discuss operating experience relevant to steam generators and to exchange ideas for integrating design, inspection and operating procedures to ensure more reliable, safe operation of steam generators at nuclear power facilities. | ||
}} | |||
Attached for your use is a Notice of the Conference and a tentative agenda.Please notify Dr. B. D. Liaw, Division of Operating Reactors, U. S.Nuclear Regulatory Commission, Washington, D. C. 20555, telephone (301) 492-8060 of your intent regarding attendance at the conference by August 25, 1978.hut, i(an i rector for Systems and Projects Division of Operating Reactors Enclosures: | |||
1. Notice of Conference | |||
2. Tentative Agenda I 14c i 1jP | |||
ENCLOSURE | |||
NO. 1 CONFERENCE | |||
NOTICE The Nuclear Regulatory Commission will sponsor a two-day Pressurized Water Reactor Steam Generator Workshop at the Holiday Inn in Bethesda, Maryland on September | |||
7 and 8, 1978. The purpose of the workshop is to provide an opportunity for industry, government, national laboratory and foreign organizations, and possibly, public representatives to present and discuss operating experience relevant to steam generator tube degradation and to exchange ideas for integrating design, inspection and operating procedures to ensure safe operation of steam generators at nuclear power facilities. | |||
The workshop will be comprised of presentations by invited speakers followed by a panel discussion. | |||
Requests for additional information, including requests to participate, should be addressed to Dr. B. D. Liaw, Division of Operating Reactors, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555. Telephone (301) 492-8060.A tentative agenda of the workshop is attached. | |||
ENCLOSURE | |||
NO. 2 PRESSURIZED | |||
WATER REACTOR STEAM GENERATOR | |||
WORKSHOP DIVISION OF OPERATING | |||
REACTORS OFFICE OF NUCLEAR REACTOR REGULATION | |||
U. S. NUCLEAR REGULATORY | |||
COMMISSION | |||
WASHINGTON, D. C. 20555 General Chairman: Darrell ,G. Elsenhut, Assistant Director for Systems and Projects Division of Operating Reactors September | |||
7, 8:00 a.m.9:00 9:1'0 a.m.a.m.9:30 a.m.10:00 aim.10:30 a.m.11:00 a.m.1978-Registration INTRODUCTORY | |||
SESSION: D. G. Eisenhut Opening and Welcome Remarks (V. Stello)-Licensing Bases for Continued Operation of PWR Steam Generators (D. G. Elsenhut)-NRC Confirmatory Research Programs (C. Z. Serpan)-Coffee Break -GENERAL SESSION: L. C. Shao-Westinghouse Steam Generator Operating Experiences (Representative | |||
-Westinghouse Electric Corporation) | |||
-Combustion Engineering Steam Generator Operating Experiences (Representative | |||
-Combustion Engineering) | |||
-B&W Steam Generator Operattng Experiences (Representative | |||
-Babcock & Wilcox, Inc.)-Lunch Break - | |||
-2 -1:30 p.m.2:00 p.m.2:30 p.m.3:30 p.m.4:00 p.m.TECHNICAL | |||
SESSION I: J. P. Knight-Eddy Current Inspection Method Evaluation (Representative | |||
-Battelle Columbus)-Advanced ECT Probe Development (Representative | |||
-ZETEC, Inc.)-PNL Steam Generator-Tube Integrity Program (Representative | |||
-Pacific Northwest Laboratory) | |||
-Coffee Break --BNL Stress Corrosion Tests (Representative | |||
-Brookhaven National Laboratories) | |||
-DOE Chemical Cleaning Program (Representative | |||
-U. S. Department of Energy)September | |||
8, 1978 9:00 a.m.9:30 a.m.10:30 a.m.11:00 a.m.TECHNICAL | |||
SESSION It: B. D. LHaw-Model Boiler Test for Reproducing Tube Denting (Representative | |||
-Combustion Engineertng, Inc.)-Improved Westinghouse Steam Generator Design to Avoid Various Forms of Tube Degradation (Representative | |||
-Westinghouse Electric Corporation) | |||
-Experience with Condenser Failures, Retubing and Consequence (Representative | |||
-Westinghouse Electric Corporation) | |||
-Turkey Point Steam Generator Replacement Program (Representative | |||
-Bechtel Power Corporation) | |||
-Lunch Break - | |||
-3 -1:30 p.m.-PANEL DISCUSSIONS: | |||
D. G. Elsenhut Panel Members: .J. R. Weeks, L. Frank, J. Muscara, J. Sctnto, F, Almeter, B. D. Liaw, and various industry representatives | |||
* Need for Secondary Water Chemistry Control* Steam Generator Tube Denting, Support Plate Cracking and Deformation | |||
.Regulation and Regulatory Guide Interpretations | |||
-Tube Plugging Criteria, ISI Requirements | |||
.Development ECT Inspection Techniques | |||
* Additional Research Programs Yankee Atomic Electric Company cc Mr. Lawrence E. Minnick, President Yankee Atomic Electric Company 20 Turnpike Road Westboro, Massachusetts | |||
01581 Greefield Community College 1 College Drive Greenfield, Massachusetts | |||
01301}} | |||
{{GL-Nav}} | {{GL-Nav}} | ||
Revision as of 11:55, 31 August 2018
| ML031280386 | |
| Person / Time | |
|---|---|
| Issue date: | 08/09/1978 |
| From: | Eisenhut D G Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| GL-78-031 | |
| Download: ML031280386 (6) | |
frx K:(c__UNITED STATES \-/ in ., NUCLEAR REGULATORY
COMMISSION
n g aWASHINGTON.
D. C. 20555 August 9, 1978 ALL PWR LICENSEES Gentlemen:
The Division of Operating Reactors, Office of Nuclear Reactor Regulation, has organized a two-day PWR Steam Generator Conference to be held at the Holiday Inn in Bethesda, Maryland on September
7 and 8, 1978. The purpose of the conference is to provide an oppor-tunity for industry, government, national laboratory, foreign, and possible public representatives to present and discuss operating experience relevant to steam generators and to exchange ideas for integrating design, inspection and operating procedures to ensure more reliable, safe operation of steam generators at nuclear power facilities.
Attached for your use is a Notice of the Conference and a tentative agenda.Please notify Dr. B. D. Liaw, Division of Operating Reactors, U. S.Nuclear Regulatory Commission, Washington, D. C. 20555, telephone (301) 492-8060 of your intent regarding attendance at the conference by August 25, 1978.hut, i(an i rector for Systems and Projects Division of Operating Reactors Enclosures:
1. Notice of Conference
2. Tentative Agenda I 14c i 1jP
ENCLOSURE
NO. 1 CONFERENCE
NOTICE The Nuclear Regulatory Commission will sponsor a two-day Pressurized Water Reactor Steam Generator Workshop at the Holiday Inn in Bethesda, Maryland on September
7 and 8, 1978. The purpose of the workshop is to provide an opportunity for industry, government, national laboratory and foreign organizations, and possibly, public representatives to present and discuss operating experience relevant to steam generator tube degradation and to exchange ideas for integrating design, inspection and operating procedures to ensure safe operation of steam generators at nuclear power facilities.
The workshop will be comprised of presentations by invited speakers followed by a panel discussion.
Requests for additional information, including requests to participate, should be addressed to Dr. B. D. Liaw, Division of Operating Reactors, U. S. Nuclear Regulatory Commission, Washington, D. C. 20555. Telephone (301) 492-8060.A tentative agenda of the workshop is attached.
ENCLOSURE
NO. 2 PRESSURIZED
WATER REACTOR STEAM GENERATOR
WORKSHOP DIVISION OF OPERATING
REACTORS OFFICE OF NUCLEAR REACTOR REGULATION
U. S. NUCLEAR REGULATORY
COMMISSION
WASHINGTON, D. C. 20555 General Chairman: Darrell ,G. Elsenhut, Assistant Director for Systems and Projects Division of Operating Reactors September
7, 8:00 a.m.9:00 9:1'0 a.m.a.m.9:30 a.m.10:00 aim.10:30 a.m.11:00 a.m.1978-Registration INTRODUCTORY
SESSION: D. G. Eisenhut Opening and Welcome Remarks (V. Stello)-Licensing Bases for Continued Operation of PWR Steam Generators (D. G. Elsenhut)-NRC Confirmatory Research Programs (C. Z. Serpan)-Coffee Break -GENERAL SESSION: L. C. Shao-Westinghouse Steam Generator Operating Experiences (Representative
-Westinghouse Electric Corporation)
-Combustion Engineering Steam Generator Operating Experiences (Representative
-Combustion Engineering)
-B&W Steam Generator Operattng Experiences (Representative
-Babcock & Wilcox, Inc.)-Lunch Break -
-2 -1:30 p.m.2:00 p.m.2:30 p.m.3:30 p.m.4:00 p.m.TECHNICAL
SESSION I: J. P. Knight-Eddy Current Inspection Method Evaluation (Representative
-Battelle Columbus)-Advanced ECT Probe Development (Representative
-ZETEC, Inc.)-PNL Steam Generator-Tube Integrity Program (Representative
-Pacific Northwest Laboratory)
-Coffee Break --BNL Stress Corrosion Tests (Representative
-Brookhaven National Laboratories)
-DOE Chemical Cleaning Program (Representative
-U. S. Department of Energy)September
8, 1978 9:00 a.m.9:30 a.m.10:30 a.m.11:00 a.m.TECHNICAL
SESSION It: B. D. LHaw-Model Boiler Test for Reproducing Tube Denting (Representative
-Combustion Engineertng, Inc.)-Improved Westinghouse Steam Generator Design to Avoid Various Forms of Tube Degradation (Representative
-Westinghouse Electric Corporation)
-Experience with Condenser Failures, Retubing and Consequence (Representative
-Westinghouse Electric Corporation)
-Turkey Point Steam Generator Replacement Program (Representative
-Bechtel Power Corporation)
-Lunch Break -
-3 -1:30 p.m.-PANEL DISCUSSIONS:
D. G. Elsenhut Panel Members: .J. R. Weeks, L. Frank, J. Muscara, J. Sctnto, F, Almeter, B. D. Liaw, and various industry representatives
- Need for Secondary Water Chemistry Control* Steam Generator Tube Denting, Support Plate Cracking and Deformation
.Regulation and Regulatory Guide Interpretations
-Tube Plugging Criteria, ISI Requirements
.Development ECT Inspection Techniques
- Additional Research Programs Yankee Atomic Electric Company cc Mr. Lawrence E. Minnick, President Yankee Atomic Electric Company 20 Turnpike Road Westboro, Massachusetts
01581 Greefield Community College 1 College Drive Greenfield, Massachusetts
01301