{{#Wiki_filter:DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 1 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 I.17 QUALITY ASSURANCE & RELIABILITY ASSURANCE Consistent with the approach taken in the new update to Chapter 17 of the Standard Review Plan, Sections I.17.1, I.17.1.1, I.17.2, and I.17.3 of this chapter point the reader to Section I.17.5
 
for the required format and content of a QA program during design, construction, and operation.I.17.1 Quality Assurance During the Design and Construction Phase
 
COL applicants should refer to Section I.17.5 for a complete discussion of the required format and content of a QA program during design, construction, and operation.
I.17.1.1  Early Site Permit Quality Assurance Measures
 
COL applicants should refer to Section I.17.5 for a complete discussion of acceptable format and content of a QA program during design, construction, and operation. This section will
 
identify those aspects of a QAPD associated with Early Site Permits, versus other applications, such as Design Certification and COL.I.17.2Quality Assurance during the Operations Phase
 
COL applicants should refer to Section I.17.5 for a complete discussion of acceptable format and content of a QA program during design, construction, and operation.I.17.3Quality Assurance Program Description
 
COL applicants should refer to Section I.17.5 for a complete discussion of acceptable format and content of a QA program during design, construction, and operation.
I.17.4  Reliability Assurance Program Guidance
 
I.17.4.1  Reliability Assurance Program (RAP) Introduction and General Requirements
 
The scope of the RAP includes risk-significant structures, systems, and components (SSCs), both safety related and nonsafety related SSCs, that provide defense in depth or result in
 
significant improvement in the probabilistic risk assessment (PRA) evaluations. The RAP is implemented in two stages. The first stage, the design RAP (D-RAP), applies to reliability
 
assurance activities that occur before the initial fuel load. The objective of the D-RAP is to
 
design reliability into the plant consistent with the NRC-established PRA safety goals. The
 
second stage, the operational RAP (O-RAP), applies to reliability assurance activities for the
 
operations phase of the plant life cycle. The goal of the combined license (COL) applicant's  O-
 
RAP is to maintain reliability consistent with the overall safety goals. Individual component
 
reliability values are expected to change throughout the course of plant life because of aging
 
and changes in suppliers and technology. Changes in individual component reliability values
 
are acceptable as long as overall plant safety performance is maintained within the NRC-
 
established PRA safety goals and deterministic licensing design basis.
The D-RAP is implemented in several phases. The first phase implements the aspects of the program that apply to the design process. During this phase, risk-significant SSCs are identified DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 2 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 for inclusion in the program by using probabilistic, deterministic, and other methods. The design certification applicant performs this phase. The design certification D-RAP is verified via the
 
inspection process and the NRC safety evaluation review process. The second phase is the
 
site-specific phase, which introduces the plant's site-specific SSCs to the D-RAP process. The
 
COL applicant performs this phase. At this stage, the D-RAP is modified or appended based on
 
considerations specific to the site. The COL applicant establishes the PRA importance
 
measures, the expert panel process, and other deterministic methods to determine and maintain
 
the site specific list of SSCs under the scope of RAP. The COL applicant's D-RAP is verified via
 
the inspection process, the NRC safety evaluation review process, and the D-RAP inspection, test, analysis, and acceptance criteria (ITAAC).
The design certification applicant is also responsible for developing D-RAP ITAAC. The design certification D-RAP ITAAC will be verified by the NRC safety evaluation review process. The
 
COL holder is responsible for completing the D-RAP ITAAC. Satisfactory completion of the
 
D-RAP ITAAC is verified by IP 65001, "ITAAC Matrix Inspections."
The COL applicant is responsible for developing and implementing the O-RAP which is an operational program. The applicant's O-RAP is verified via the inspection process, the NRC
 
safety evaluation review process, and the licensing condition process.
The following is intended to provide guidance to applicants. Except in those cases in which the applicant proposes an acceptable alternative method for complying with specified portions of
 
the Commission's regulations, the methods described herein will be used by the staff in its
 
evaluation of conformance with Commission regulations.
The provisions of this SRP section apply to reviews of COL applications under 10 CFR Part 52 docketed 6 months or more after the date of issuance of this SRP section.
Any exceptions or alternatives to this SRP section will be reviewed to ensure that they are defined and that an adequate basis exists for their acceptance. When required, the staff will
 
prepare a request for additional information for the applicant and review the response for
 
acceptability.
I.17.4.2  Staff Review of the RAP at COL Application Phase
 
The following is provided to give the COL applicant insight into staff focus areas during review of the COL application:1.The staff reviews the process used by the applicant for identifying site-specific risk-significant SSCs and determines if the applicant has properly identified the site-specific
 
risk-significant SSCs.2.The staff reviews and inspects the applicant's QA controls for developing and implementing the D-RAP.3.The staff reviews the D-RAP (scope, purpose, objectives, and essential elements).
4.The reviews the O-RAP (scope, purpose, objectives, and essential elements) .
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance 1 RAW is the increase in risk if the SSC is assumed to be failed for all failure modes (e.g., failure to start, failure to run). See NUREG/CR-3385 for additional details.
2 RRW is the decrease in risk if the SSC is assumed to be perfectly reliable for all failure modes (e.g., failure to start, failure to run). See NUREG/CR-3385 for additional details.
3 FVI is related to RRW on a ratio scale. See NUREG/CR-3385 for additional details.
Pg 3 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/20065.The staff's overall acceptance criteria is that the RAP is fully described the COL applicant's Final Safety Analysis Report (FSAR).
I.17.4.3  COL Applicant RAP Information Requirements
 
The COL applicant should include the following information in the FSAR submittal. The COL applicant should focus information on the site-specific risk-significant SSCs:
I.17.4.3.1  The scope, purpose, objectives and essential elements of the D-RAP.
 
I.17.4.3.2  A description of the process for identifying and prioritizing SSCs based on risk significance. The description should address the following:a.The dominant failure modes should be identified and prioritized.
b.Identify the effects associated with those failure modes and subsequent component failure prevention or mitigation.c.The role industry experience, analytical models, and expert panel contributed in categorizing the safety significance of SSCs. d.The key assumptions and determinations of risk significance that are derived from probabilistic, deterministic, or other methods that consider operations, maintenance, and monitoring activities for identifying component reliability and
 
failure data.e.The expert panel qualifications in the areas of personnel knowledgeable in the systems, operations, and maintenance of a plant, and experience necessary to
 
perform the SSC selections.f.The applicant's use of a combination of PRA importance measures for RAW 1 , and RRW 2 or FVI 3.I.17.4.3.3  A description of the operating experience used to define the significant failure modes and their likely causes and reliability. For exam ple, reliability analyses can be performed using common databases from industry sources such as Institute of Nuclear Power Operations and
 
the Electrical Power Research Institute.
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 4 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 I.17.4.3.4  The applicant should describe the controls for the RAP. The description should address the following:a.The organization responsible for formulating and implementing the RAP.
b.The management staff responsible for the design and licensing.
c.The coordination of program activities, including those performed within the design organization as well as work completed by the architect-engineers and
 
other supporting organizations.d.The risk and reliability organization within the design organization responsible for developing the RAP and access to the design staff.e.The interface between the risk and reliability organization and the design organization for determining that the performance of risk-significant SSCs relate
 
to the reliability assumptions in the PRA.(1)How the reliability organization and the design organization manage interface issues.(2)The risk and reliability organization methods for keeping the design staff cognizant of risk-significant items, program needs, and status.(3)The risk and reliability organization participation in the design change control process for the purpose of providing RAP related inputs in the
 
design process.(4)The risk and reliability organization involvement in design reviews.f.Engineering controls applied for determining SSCs within the scope of the RAP.
g.How procurement and fabrication specifications reflect the reliability values assumed in the PRA.h.Procedural controls applied to the D-RAP program.
i.Storage and retrieval controls applied to documentation of the RAP program.
j.Corrective action controls applied to RAP SSCs.k.The process for proposing an alternative design to improve performance in either area. For example, is the revised design reviewed to provide confidence that the
 
current assumptions in the other areas are not violated. When a potential conflict
 
exists between safety goals and other goals, do safety goals take precedence?l.The proposed design feedback process used to ensure that the design DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 5 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 organization determines that significant design assumptions related to equipment reliability and unavailability are realistic and achievable. Does the design
 
feedback process include the methodology used to consider industry experience, analytical models, and existing requirements for the PRA dominant failure
 
modes?m.QA requirements implemented during the procurement, fabrication, installation, construction, and testing of risk-significant SSCs.
I.17.4.3.5  A D-RAP ITAAC that provides reasonable assurance that the design of risk-significant SSCs is consistent with their risk analysis assumption. The ITAAC acceptance
 
criteria should ensure that the estimated reliability of each as-built risk-significant SSC is at least
 
equal to the assumed design reliability and that industry experience including operations, maintenance, and monitoring activities were assessed in estimating the reliability of these
 
SSCs.I.17.4.3.6  Any design and operational information to be used by the COL applicant for plant reliability assurance activities. This information may include possible failure modes and
 
suggestions for failure prevention or mitigation.
I.17.4.3.7  A description of how the O-RAP is integrated into existing programs (e.g., maintenance, surveillance testing, inservice inspection, inservice testing, and QA). The
 
description should address the following:a.How reliability performance goals for risk-significant SSCs would be established consistent with the existing maintenance and QA processes on the basis of
 
information from the D-RAP.b.Performance and condition monitoring requirements that provide reasonable assurance that risk-significant SSCs do not degrade to an unacceptable level
 
during plant operation. Implementation of the maintenance rule following the
 
guidance contained in Regulatory Guide 1.160, "Monitoring the Effectiveness of
 
Maintenance at Nuclear Power Plants," meets the objective of reliability
 
assurance for monitoring and correcting degradation in SSC reliability or
 
availability. c.The feedback mechanism for periodically reevaluating risk significance on the basis of actual equipment, train, or system performance.  (The reliability
 
performance monitoring does not need to statistically verify the numerical values
 
used in the PRA. However, it provides a feedback mechanism for periodically
 
reevaluating risk significance on the basis of actual equipment, train, or system
 
performance.)d.Any reliability assurance activities incorporated into the maintenance rule, 10 CFR 50.65, the QA, surveillance, inservice inspection, inservice testing, and
 
technical specification allowable outage time programs.
I.17.4.3.8  The administrative processes and proc edures for providing corrective actions for DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 6 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 design and operational errors that degrade nonsafety-related, risk-significant SSCs.
I.17.4.3.9  Any maintenance assessments or recommendations for risk-significant SSCs to enhance reliability.
I.17.4.3.10  A licensing condition stating that the O-RAP will be fully implemented prior to loading fuel.I.17.4.4NonSafety Systems
 
Regulatory Treatment of Non-Safety Systems (RTNSS) is a program for nonsafety related SSCs that are important to safety and covers passive plant designs, such as the Westinghouse
 
AP1000. Combined license (COL) applicants should refer to the guidance on nonsafety
 
systems that are safety significant, found in paragraph "Y" of Section 17.5.3 of this chapter.
I.17.5  QUALITY ASSURANCE PROGRAM GUIDANCE
 
I.17.5.1  Introduction and General Requirements
 
An applicant is responsible for the establishment and execution of a quality assurance (QA) program applicable to activities during design, construction, pre-operational testing, and
 
operation of the nuclear power plant. An applicant's QA program is executed through a
 
hierarchy of written policies, procedures and instructions. The QA program must be established
 
at the earliest practical time consistent with the schedule for accomplishing an activity. The
 
quality assurance program description (QAPD) should be included in Chapter 17 of the Safety
 
Analysis Report (SAR) or, alternately, as a topical report incorporated by reference in the SAR.
The quality assurance program description is submitted in accordance with the provisions of 10 CFR 50.34 (referenced from 10 CFR 52.79). The program must meet the requirements of
 
Appendix B to 10 CFR Part 50. Although the format of the program description is left to the
 
discretion of the applicant, each of the Appendix B criteria must be addressed in sufficient detail
 
to enable the reviewer to determine whether and how each criteria is satisfied in accordance
 
with 10 CFR 50.34 and the bases documents of SRP Section 17.5. The inspection and survey
 
systems required by §50.55a, "Codes and Standards," of 10 CFR Part 50 may be used in partial
 
fulfillment of these requirements to the extent t hat they are shown by the description of the QA program to satisfy the applicable Appendix B requirements.
The submittal should describe a comprehensive quality assurance program applicable to design, construction, and operation. For multi-unit sites, the COL applicant should describe the
 
organizational arrangement and functions to meet the needs of the multiple units. The
 
discussion should include the extent to which the arrangement and functions are shared and a
 
descriptions of the divisions and/or controls established to preserve the integrity of individual
 
units and programs.
The objectives of pre-application QA interactions with the NRC are similar to those called for in ESP Inspection Manual Chapter 2501, and those identified in Inspection Procedure 35002-01, Early QA Meeting. Although NRC regulations do not require submittal of a QAPD in a pre-COL
 
application, it is recommended that applicants resolve design and construction QA issues in a DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 7 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 pre-application time frame. Operational QA issues could be deferred to the COL application.
NOTE:  SRP Section 17.5 will be the principle guidance for NRC reviews of QAPD's submitted by applicants. SRP Sections 17.1, 17.2, and 17.3 will not be updated or used
 
by NRC reviewers for new plants.
SRP Section 17.5 describes a standard QA program for DC, ESP, CP, OL, and COL applicants and holders. SRP Section 17.5 is based on ASME Standard NQA-1 (1994 Edition); Regulatory
 
Guide (RG) 1.8, "Qualification and Training of Personnel for Nuclear Power Plants," Revision 3;
 
RG 1.28, "Quality Assurance Program Require ments (Design and Construction)," Revision 3; RG 1.33, "Quality Assurance Program Requirements (Operation)," Revision 2; and NRC Review
 
Standard (RS)-002, "Processing Applications for Early Site Permits."
NOTE:  DC, ESP, and COL applicants are identified as an "applicant"; COL holders are identified as a "holder" throughout this chapter of the regulatory guide.
A QAPD submitted by an ESP applicant applies to site suitability activities and would be reviewed and evaluated by the NRC prior issuing the ESP.
A QAPD submitted by a DC applicant addresses design QA in support of a DC; it would not address activities that occur subsequent to the beginning of construction. The NRC would
 
evaluate the QAPD submitted by the DC applicant prior to approval of the DC.
A QAPD submitted by a COL applicant applies to all phases of a facility's life, including design, construction, and operation. COL applicants referencing a DC must address the COL items
 
identified in Chapter 17 of the referenced generic DCD. A QAPD may be submitted in two
 
phases, the first phase to cover construction QA activities and the second to cover operational
 
QA activities. Where portions of the operational QA program have not been established at the
 
time the SAR is prepared, the description should provide a schedule for implementation and a
 
description of the transition process from the design/construction QA program to the operational
 
QA program. The NRC would evaluate the QAPD for the construction phase prior to issuing the
 
COL; the NRC would evaluate the QAPD for the operational phase prior to authorizing initial fuel
 
loading.The applicant's QA program(s) should incorporate the most recently NRC-endorsed QA standards. If an applicant chooses not to follow the standardized regulatory guidance in this
 
section, the QAPD should describe specific alternative methods to be used, how  these
 
alternatives would be implemented, and the organi zations responsible for their implementation.
If an applicant elects to propose and justify using the existing QA program for its operating
 
"fleet," QA controls applicable to construction activities must be addressed Where a QAPD commits to follow the guidance of a regulatory guide, the QAPD should address how the guidance would be applied, the extent of applicability, and the organizational elements
 
responsible for implementing this guidance. The organizational elements should identify those
 
of the applicant, the architect-engineer, the nuclear steam system supplier, the constructor, and
 
the construction manager (if other than the constructor).
If the station incorporates, or plans to incorporate, other nuclear or nonnuclear power DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 8 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 generating facilities, interfaces with the other facilties should be described. The description should include any planned sharing of personnel, a description of their duties, and the
 
proportion of their time expected to be assigned to other units.
The QAPD should describe the extent to which the applicant will delegate the work of establishing and executing the QA program or any part thereof to other contractors. The QAPD
 
should clearly delineate those QA functions which are implemented within the applicant's QA
 
organization and those which are delegated to other organizations. The QAPD should describe
 
how the applicant will retain responsibility for and maintain control over those portions of the QA
 
program delegated to other organizations. The QAPD should identify the responsible
 
organization and the process for verifying that delegated QA functions are effectively
 
implemented. The QAPD should identify major work interfaces for activities affecting quality and describe how clear and effective lines of communication between the applicant and his
 
principal contractors are maintained to assure coordination and control of the QA program.
I.17.5.1.1  General Requirements for QAPD Information to be Provided:
 
Provide information on the controls to be used for the nuclear power plant, to include a discussion on how the applicable requirements of Appendix B will be satisfied for all phases of a
 
facility's life, including design, construction, operation, and modification. Describe how each of
 
the acceptance criteria is met.
Include an evaluation of the facility against the SRP in effect 6 months prior to the docket date of the application of a new facility. Alternatives to or differences from the SRP must be
 
identified and justified in the application.
Provide a description of the QA program for the design, fabrication, construction, and testing of the structures, systems, and component s (SSCs) important to safety.
Provide a description of the controls established to ensure reporting of defects or failures that are determined to be substantial safety hazards. Describe how reportable defects or
 
noncompliances are identified, evaluated, and reported under the 10 CFR Part 50, Appendix B, QA program and how the requirements of 10 CFR Part 21 and 10 CFR 50.55(e) are established
 
to ensure that substantial safety hazards are 1) evaluated, 2) subject to proper corrective action, and 3) identified to the NRC so it can evaluate the adequacy of corrective actions and consider
 
any generic implications.
Provide a description of the controls established to ensure compliance with 10 CFR 50.55a requirements that SSCs be designated, fabricated, erected, constructed, tested, and inspected
 
to quality standards commensurate with the importance of the safety function to be performed.
Provide a description of the controls established to ensure the requirements of 10 CFR 50.34(f)(3)(ii) and (iii) are met, so that:1)all SSCs important to safety are listed in accordance with Criterion II of  Appendix B to 10 CFR Part 50, 2)independence exists between organizations performing checking functions and DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 9 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 those responsible for performing the function,3)QA is implemented during construction, 4)QA personnel are included in the documented review and concurrence in quality-related procedures,5)QA personnel are qualified, 6)sizing of the staff is commensurate with its duties and responsibilities, 7)procedures are established for maintenance of as-built documentation, 8)QA maintains a role in design and analysis activities, 9)criteria are established for QA programmatic requirements.
I.17.5.2  Organization of Section I.17.5.3
 
Section I.17.5.3 of this chapter is organized into the 26 areas (A through Z) listed below. Sections A through X apply to SSCs. Section Y applies only to nonsafety-related SSCs.
 
Sections A through Y apply to COL applicants and COL holders. Section Z applies only to
 
holders of a COL (operational phase). Areas not applicable to DC and ESP applicants are
 
annotated as such in Section 17.5.
A. ORGANIZATION B. QUALITY ASSURANCE PROGRAM
 
C. DESIGN CONTROL AND VERIFICATION
 
D. PROCUREMENT DOCUMENT CONTROL
 
E. INSTRUCTIONS, PROCEDURES, AND DRAWINGS
 
F. DOCUMENT CONTROL
 
G. CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES
 
H. IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, AND COMPONENTS
 
I. CONTROL OF SPECIAL PROCESSES
 
J. INSPECTION
 
K. TEST CONTROL
 
L. CONTROL OF MEASURING AND TEST EQUIPMENT
 
M. HANDLING, STORAGE, AND SHIPPING
 
N. INSPECTION, TEST, AND OPERATING STATUS
 
O. NONCONFORMING MATERIALS, PARTS, OR COMPONENTS DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 10 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 P. CORRECTIVE ACTION Q. RECORDS
 
R. AUDITS
 
S. TRAINING AND QUALIFICATION CRITERIA - QUALITY ASSURANCE (QA)
 
T. TRAINING AND QUALIFICATION - INSPECTION AND TEST
 
U. QA PROGRAM COMMITMENTS
 
V. 10 CFR PART 21 AND 10 CFR 50.55(e) PROGRAMS FOR REPORTING DEFECTS AND  NONCOMPLIANCEW.COMMERCIAL GRADE DEDICATIONX.DIGITAL EQUIPMENT SOFTWARE VERIFICATION AND VALIDATION QUALITY CONTROLSY.NONSAFETY-RELATED SSC QUALITY CONTROLS Z.INDEPENDENT REVIEWI.17.5.3.A. ORGANIZATION Provide a written QAPD, issued at the most senior management level, that establishes the quality policy, commits the organization to implement it, and contains information meeting all the
 
detailed requirements of SRP Section 17.5, including:*A description of requirements that work is accomplished only by personnel qualified in accordance with written procedures, and that implementing
 
procedures are reviewed and approved by the managers responsible for their
 
implementation.*An organizational description that addresses the organizational structure, functional responsibilities, levels of authority, interfaces and associated
 
responsibilities, for all elements that function under the cognizance of the QA
 
program.  (Onsite/offsite, operational, and maintenance organizational elements
 
are not applicable to DC applicants.)*A description of controls to ensure there is independence between persons and organizations performing activities and those executing verification and audit
 
activities.*A description of a management position with sufficient authority and organizational freedom to implement the QA program without undue influence
 
from cost and schedule considerations and refer appropriate matters to the top
 
management in a timely manner.*A description of QA program responsibility and authority to stop unsatisfactory work and control further processing, delivery, installation, or use of DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 11 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 nonconforming items. *A description of controls to assure proper delegation of responsibility and authority to carry out delegated portions of the program, while retaining licensee
 
responsibility for the program.I.17.5.3.B. QUALITY ASSURANCE PROGRAM
 
Provide information in the QAPD that descri bes the applicant's Quality Assurance Program, including:*A description of requirements for regular management, QA program participant, and senior management status and adequacy reviews of the QA program.*A description of the criteria used to identify the items and activities to which the QA program applies, and a list of the SSCs and/or activities under the control of
 
the QA program.  *A description of the requirements for documenting the QA program through written policies, procedures, or instructions *A description of requirements for ensuring personnel are trained and resources provided before commencing any activity within the scope of the QA program. *A description of requirements for applicant/holder responsibility for the scope and implementation of an effective QA pr ogram and its binding applicability, even to management personnel responsible for costs and schedules.
Provide a commitment that documentation of QA program criteria, applicable SSCs and all activities controlled by the QA program will be established and maintained at the applicant or
 
holder's facility.I.17.5.3.C. DESIGN CONTROL AND VERIFICATION
 
Provide a description of the design control program that meets the requirements of SRP Section 17.5.C, including:*Description of a program with provisions to correctly control design inputs, processes, outputs, changes, interfaces, records, organizational interfaces and
 
documentation of design and design verifications.*Description of requirements ensuring the final design (approved design output documents and approved changes) identifies the assemblies and/or components
 
that are part of the item being designed.*Description of design process controls that ensure items and activities are selected and independently verified to ensure they are suitable for their intended
 
application, changes are subject to control measures commensurate with those DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 12 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 applied to the original design, and design information transmitted across interfaces is documented and effectively controlled.*Description of controls for adequacy of design records, documentation of design inputs, sources and design analyses, design analysis computer programs, design
 
calculations, and the legibility, reproducibility, storage and retrievability of design
 
documents.*Description of the means by which applicable information derived from experience, as set forth in reports or other documentation, is made available to
 
cognizant design personnel.*Description of the role of quality assurance in design and analysis activities
*Description of the measures established for the selection and review for suitability of application of materials, parts, equipment, and processes that are
 
essential to the safety-related functions of the SSCs.*Description of the controls used to conduct design verification, including requirements for sufficiently detailed documentation relating design inputs to
 
design output products to allow verification, clear identification of the design
 
verifier. *Description of requirements for documentation of verification methods used, use of alternate calculations to verify appropriateness of inputs, assumptions, calculation methods, and/or computer programs.  *Description of the types of questions used in design verification, including questions verifying:*Selection of design inputs
*Description of assumptions necessary for the design activity
*Appropriateness of design method(s)
*Correct incorporation of design inputs
*Documented specification of design inputs and verification requirements for interfacing organizations*Correct verification method(s)
*Identification of appropriate acceptance criteria, including tolerances*Description of controls used when design adequacy is verified by qualification tests, including requirements for identification of tests, test conditions, design
 
features tested, documentation of test results, any modifications required as a DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 13 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 result of testing, retests, and model/mockup scaling, verification and error analysis in models/mockups*Description of controls for assuring completion of verification prior to use of designs, especially prior to irrevocable use, independence of verifier from
 
designer, verification of changes to design, including analysis of effects of
 
changes, and verification of applicability of standardized or previously approved
 
design, with respect to meeting pertinent design inputs, prior to each subsequent
 
application of a design. I.17.5.3.D. PROCUREMENT DOCUMENT CONTROL
 
Provide a description of the procurem ent document control program, including:*Description of controls to assure applicable technical, regulatory, administrative, and reporting requirements (such as specifications, codes, standards, tests, inspections, special processes, and 10 CFR Part 21, "Reporting of Defects and
 
Noncompliance," and 10 CFR 50.55(e)) are invoked for procurement of items
 
and services.*Description of the controls to assure procurement documents contain the appropriate information, including adminis trative items such as submission date as well as:*Scope of work statement
*Specification of technical requirements and description of items or services to  be furnished*Identification of test, inspection and acceptance requirements for monitoring supplier performance*Identification of the supplier's QA program
*Access to supplier facilities and records
*Requirements for documentation submission and reporting of defects and noncompliances*Description of controls applied to changes to procurement documents, including changes resulting from bid evaluation, negotiations or other actions, and
 
appropriate review of those changes by qualified personnel.I.17.5.3.E.INSTRUCTIONS, PROCEDURES, AND DRAWINGS (CONTROLLED DOCUMENTS)
Provide a description of controls to assure activities affecting quality are prescribed by and accomplished in accordance with documented instructions, procedures, or drawings, under DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 14 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 suitably controlled conditions.
Provide a description of controls to assure instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining satisfactory completion
 
of the given activity.I.17.5.3.F.DOCUMENT CONTROL
 
Describe the program established to control the development, review, approval, issue, use, and revision of documents. Include in the description the following:*Describe controls to assure the scope of the document control program is defined.  *Describe controls for adequate review and approval of revisions to controlled documents by a knowledgeable, qualified organization, including controls to
 
assure access to pertinent background data or information necessary for
 
approval.*Describe controls to identify, prepare, review, approve, distribute, and require the use of new and revised controlled copies of instructions and procedural
 
documents and to control superseded documents.  *Describe the means used to ensure controlled documents are adequate, complete and correct prior to distribution and use, including controls to ensure
 
QA review and concurrence on procedures for use on safety related SSCs. *Describe the requirements for frequency of periodic reviews, or the controls applied if procedure/document reviews will not be done on a periodic (i.e., every
 
2 year) basis. Include a description of the criteria and measures to ensure
 
changes, revisions and temporary changes receive the appropriate levels of
 
review by knowledgeable personnel. Include a description of controls for
 
processing minor changes not requiring the same levels of review and approval. *Describe control measures to prevent use of outdated or inappropriate documents, including:a.identifying the proper document to be used in performing the activityb.coordinating and controlling interface documents c.ascertaining that proper documents are being used*Describe provisions for systematic review and feedback for improvement of procedures in current use.I.17.5.3.G.CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES
 
Provide a description of the quality assurance program established to ensure that purchased items and services, including spare and replacement parts, are of acceptable quality, and are DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 15 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 suitable for their intended purpose. Include in this description the following:*Describe the provisions for evaluation, selection, and means to assured continued acceptability of qualified suppliers and the products and services they
 
provide.*Describe provisions for accepting purchased items and services, and for verifying procurement, inspection, and applicable test requirements have been satisfied
 
before using or placing a procured item in service.*Describe the documentation of procurement activities, demonstrating a systematic approach to the procurement process, identification of procurement methods, and organizational responsibilities. Include a description of the
 
measures used to evaluate and select procurement sources and document the
 
results from these activities.*Describe the established measures to interface with the supplier and to verify the supplier's performance, including measures to assure clear understanding of
 
purchase order requirements, exchange documented information, evaluate and process changes, modifications and exceptions, conduct document reviews, verifications, surveillance activities and inspections at supplier premises, add or modify design criteria, and firmly establish supplier responsibility for achieving
 
quality requirements.
In cases involving procurement of services only, describe the methods used to accept services from suppliers.*Describe the controls, requirements, and organizational processes established for reporting, documenting, processing, reviewing, approving and/or correcting
 
supplier nonconformances, including nonconforming items.*Describe methods used to accept an item or related service from a supplier, and to verify the quality of a product or service. Include in the description the criteria
 
and information that are included in the documentation (e.g., certificates of
 
compliance and conformance, receipt inspection and or test documents)
 
associated with acceptance and verification.*Describe controls to assure that program requirements apply and are extended to all phases of procurement and levels of suppliers. Include in the description
 
the reviews of procurement documents and changes to them to ensure that
 
documents transmitted to the prospective supplier(s) include appropriate
 
provisions for ensuring that items or services will meet the specified requirements.*Describe the criteria for use, the processes and controls applied to the means for assuring purchase requirements are met, including surveillance, source
 
verification, receipt inspection, and post-installation testing.
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 16 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006I.17.5.3.H.IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, AND COMPONENTS*Describe the controls, methods, and documentation used to assure that items (consumables, items with limited shelf life, materials, parts, and components, including partially fabricated assemblies) are clearly identified, traceable to
 
manufacturing documentation and specifications, and controlled from initial
 
receipt and fabrication up to and including installation and use, to prevent the use
 
of incorrect or defective items. Include a description of provisions to ensure
 
identification of items is consistent with the planned duration and conditions of
 
storage.I.17.5.3.I CONTROL OF SPECIAL PROCESSES*Describe the program established to ensure special processes, such as welding, heat treating, and nondestructive examination are properly controlled. Include a
 
description of the criteria used to classify a process as special, the controls for
 
performance of special processes by only properly trained and qualified
 
personnel, and the applicable controls for records and documentation, use of
 
procedures, drawings, instructions, checklists and adherence to applicable codes
 
and standards.I.17.5.3.J. INSPECTION
 
Provide a description of controls for an inspection program (source, in-process, final, receipt, maintenance, modification, inservice, and operations). Include in the description the following:*A description of inspection planning and details required for inspection plans.
*A description of controls for hold points, documentation of inspection results, and action in response to nonconformances. *A description of controls for inspection records and the information required in inspection records.*A description of controls for independence of inspectors, activities requiring the use of qualified inspection personnel, management review, and use of
 
instructions, procedures and drawings to control inspections and their results.*A description of controls for inspection requirements and acceptance criteria.
*A description of controls for inspection and test in light of modifications, repairs, and replacements performed subsequent to the final inspection.I.17.5.3.K. TEST CONTROL
 
Describe the test control program for demonstrat ing that items will perform satisfactorily in service, including:
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 17 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006*A description of controls establishing when tests are required and qualification requirements for test personnel.*A description of the different types of tests and test procedure structure and controls, including a description of test prerequisites, test conditions, acceptance
 
criteria, mandatory hold points, data gathering, and test equipment requirements.*A description of controls for documentation and evaluation of test results, including the kinds of information required to be documented in test records.I.17.5.3.L.CONTROL OF MEASURING AND TEST EQUIPMENT
 
Describe the measuring and test equipment control program for the calibration, maintenance, and use of measuring and test equipment, including: *A description of the types of equipment covered by the program and the controls for periodic or pre/post-use calibration of test equipment, including the criteria on
 
which calibration frequency is based.*A description of controls for use of test equipment, including identification and marking for control of calibration status to prevent use of faulty test equipment
 
and controls for traceability to calibration test data, secondary standards, and
 
applicable nationally recognized (National Institute of Standards and Technology)
 
standards.*A description of controls for handling and evaluation of test equipment found to be out of calibration and evaluation of the acceptability of SSCs on which the out-
 
of-calibration test equipment had been used.*A description of controls for calibration procedures including documentation of and checks for test equipment accuracy and tolerances. *A description of controls for calibration records, including the calibration status of measuring and test equipment. I.17.5.3.M. HANDLING, STORAGE, AND SHIPPING (NOT APPLICABLE TO DC APPLICANTS)
Provide a description of controls established for package marking and labeling, handling and storage of items to assure adequate identification, maintenance and preservation of items, including:  *A description of controls for items requiring special environments or need for other special controls.*A description of requirements and controls for special protective measures.
*A description of controls and requirements for development and use of special DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 18 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 procedures for cleaning, handling, storage, packaging, shipping, and receiving. I.17.5.3.N. INSPECTION, TEST, AND OPERATING STATUS (NOT APPLICABLE TO DC AND ESP APPLICANTS)
Provide a description of the controls for inspection, test, and operating status of items to preclude inadvertent bypassing of inspections and tests and to prevent inadvertent operation, including:*A description of controls for the application and removal of status indicators and labels for SSCs in the nuclear power plant, including procedures for authority to
 
apply and remove tags, markings, labels, and stamps.*A description of controls and procedures for independent verification of equipment status controls. *A description of controls, including procedures and record keeping requirements for installation, removal, independent verification, and status control of temporary
 
modifications. I.17.5.3.O.NONCONFORMING MATERIALS, PARTS, OR COMPONENTS
 
Provide a description of the controls for nonconforming materials, parts, or components to prevent their inadvertent test, installation, or use, including:*A description of the controls established to review nonconforming items and disposition them as accepted, rejected, repaired, or reworked, including control of
 
the process by documented procedures, disposition approval by authorized
 
personnel, and documentation of the disposition with appropriate technical
 
justification(s).*A description of the controls that ensure the design control measures applied to the original design are also applied to design nonconformances that are
 
dispositioned "use-as-is" or "repair,"including the controls for updating applicable
 
records and as-built documentation.I.17.5.3.P. CORRECTIVE ACTION
 
Provide a description of the controls for the corrective action (problem identification and resolution) process, including:*A description of specific responsibilities for executing the program, including the defined responsibilities of performance and verification personnel and the
 
applicant/holder's retention of overall responsibility for program effectiveness, even when particular responsibilities are delegated.*A description of the measures in place to foster/encourage timely and accurate identification of all conditions adverse to quality, including the failure to follow DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 19 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 procedures, without fear of negative reaction.*A description of controls for ensuring conditions adverse to quality are promptly identified, documented, classified, analyzed for cause, corrected and followed up.*A description of controls for ensuring root causes of significant conditions adverse to quality are determined and eliminated to prevent recurrence, and for
 
ensuring subsequent corrective actions do not nullify prior corrective and
 
preventive actions. *A description of measures to identify, analyze, and report to appropriate levels of management any adverse trends and signifi cant conditions adverse to quality.*A description of the controls to assure appropriate response to nonconforming parts issues, design, and design process issues requiring significant design
 
changes.*A description of the controls to ensure competency, knowledge, and access to pertinent information of personnel involved in the corrective action process, including and especially those assigned to evaluate and determine corrective
 
action/disposition of nonconformances. I.17.5.3.Q.RECORDS
 
Provide a description of a records program that ensures adequate documentation of completed work by requiring storage of appropriate records of items and activities, including:*A description of the procedures, instructions, and other documentation that define, implement, and enforce the records system(s).*A description of the controls for generation, distribution, use, maintenance, storage and disposition of electronic media. Include a description of the means
 
used to ensure the records are defect free and the implementation of Generic
 
Letter 88-18, "Plant Record Storage on Optical Disks."*A description of the controls for the administration, receipt, storage, preservation, transmittal, location, maintenance, distribution, safekeeping, retrieval, and
 
disposition of records, including measures to ensure electronic records are
 
retrievable in human-readable format and are secure and protected, and
 
measures to ensure records are examined for adequacy, legibility, and completeness.*A description of the required content and controls for design documentation and records, and inspection and test records.*A description of the training provided to individuals or organizations in charge of electronic records generation, data/media storage, implementation of security
 
measures, migration/regeneration, and recovery.
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 20 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006*A description of the controls to assure that design specifications, test and operational procedures, procurement and other documents specify the records
 
generated, supplied, or maintained.*A description of the measures taken to identify/certify documents as valid records, classify and appropriately handle records, including electronic records, as lifetime or nonpermanent, and to assure indexing system(s) provide sufficient information to permit identification between the record and the item(s) or
 
activity(ies) to which they apply. *A description of the controls and retention periods imposed for programmatic and for product nonpermanent records.*A description of the controls for implementation of electronic record migration/regeneration for electronic records which have standard life
 
expectancies that cannot meet the required retention period.  *A description of the cleanliness, environmental condition, and other storage controls implemented for electronic records.*A description of the personnel responsibilities, requirements, and other controls implemented for correction of records, including electronic records. *A description of the personnel responsibilities, requirements, and other controls for implementation of a records receipt control system that assures records are
 
protected and inventoried, and for electronic records, assures an inventory of
 
system applications, record formats, and programs required to process and
 
retrieve electronic records is maintained.*A description of the controls for training and qualification records.
*A description of the records system audit/inspection process, including the process requirements to ensure electronic records retrievability, integrity, and
 
retention period. I.17.5.3.R. AUDITS
 
Provide a description of the responsibilities, procedural requirements, and other controls implementing the audit system, including:*A description of measures taken to assure personnel responsible for carrying out the audit function, including safety committee activities, audits, and other
 
independent assessments, are cognizant of day-to-day activities so that they can
 
act in a management advisory function.*A description of the priorities, orientation, and results focus for organizations with responsibilities for independent audit and oversight.
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 21 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006*A description of the controls for use of procedures and qualified personnel in the conduct of the audit function, and the measures to assure access to appropriate
 
levels of management to achieve res ponsive corrective and preventive action.*A description of the outside/offsite audit of the individual or organization responsible for verifying QA program implementation activities (not applicable to
 
DC applicants).*A description of the system of planned and periodic audits, including a discussion of  frequency and schedule that assures all elements of an organization's QA
 
program are audited within a 2-year period. Include a description of the minimum
 
scope and focus of audits to assure assessment of the compliance and
 
effectiveness of audited elements of the organization's QA program and of
 
program functions/activities delegated to others, and to demonstrate that audits
 
provide a comprehensive, independent evaluation of activities and procedures.*A description of the organization's audit planning functions and contents of audit plans.*A description of QA organization and the audited organization responsibilities, required actions and process steps upon completion of an audit, including the
 
documentation, management review, response to and follow-up of audit results.*A description of the organization's system for procurement audits to assure the applicable requirements of 10 CFR Part 50, Appendix B, are applied to suppliers
 
of parts, services, software and other products falling under the program. Include
 
a description of exceptions to audit requirements, frequency of audits and
 
criteria/circumstances that would require additional audits, use of third party
 
audits, audit scope, audit report content and documentation requirements, and
 
the scope of documented periodic (annual) evaluations of suppliers.*A description of QA audit report content, signature, and issuance requirements, and associated process steps. *A description of the process for periodic records systems audits. I.17.5.3.S. TRAINING AND QUALIFICATION CRITERIA - QUALITY ASSURANCE
 
Provide a description of Quality Assurance (QA) training programs and qualification criteria for individuals holding responsibilities for execution and management of the QA program, including:*A description of the criteria, content, and scope of training programs to ensure that QA personnel achieve and maintain suitable proficiency.*A description of the education and qualification requirements for the individual assigned to manage the QA program.
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 22 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006*A description of the qualification requirements for individuals responsible for planning, implementing, and maintaining the QA plan, and for lead auditors.*A description of the requirements, minimum content, and approval of qualification records, and the process for establishing and maintaining the system of records
 
of personnel qualifications for auditors and lead auditors performing audits.I.17.5.3.T. TRAINING AND QUALIFICATION - INSPECTION AND TEST
 
Provide a description of the system of requi rements, process, and documented procedures for qualification, performance review, and qualification re-evaluation of personnel who perform
 
inspection and test activities, including:*A description of the education and experience requirements for qualification of Level I, II, and III test and inspection personnel.*A description of requirements for direct observation and supervision of persons in on-the-job training for qualification as an inspection and test person.I.17.5.3.U.QA PROGRAM COMMITMENTS
 
Provide a documented list and description of QA program commitments, including the list of regulatory guides and standards, and their appropriate revision, to which the applicant/holder is
 
committed, consistent with the requirements of SRP Section 17.5.
Note any exceptions or alternatives to the s pecific criteria in any of these RGs being proposed, and provide adequate justification for these exceptions or alternatives. I.17.5.3.V.10 CFR PART 21 AND 10 CFR 50.55(e) PROGRAMS NOTE:  DC, COL, and ESP applicants are subject to the requirements of 10 CFR Part 21, which address the reporting of defects and noncompliances. Prior to fuel
 
load authorization, COL applicants and holders are subject to the requirements of
 
10 CFR 50.55(e). However, once the Commission has authorized the loading of
 
fuel, COL holders are subject to the requirements of 10 CFR Part 21.
Provide a description of the program for implem enting the requirements of 10 CFR Part 21 AND 10 CFR 50.55(e), including identification, documentation and preliminary evaluation of all non-
 
conforming conditions for "discovery" as defined in 21.3, i.e., to determine whether they should
 
be evaluated under 21.21(a)(1).  *Specifically, describe how the program or process for identification of non-conforming materials, parts or components, under Criterion XV of Appendix B to
 
10 CFR Part 50, or conditions or significant conditions adverse to quality under Criterion XVI, ensures that nonconformances or conditions are screened for
 
evaluation under Part 21 or 50.55(e), as applicable.  *Describe how the screening process for discovery prior to 21.21(a)(1) evaluation considers:
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 23 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006(1) whether they involve anything that is a basic component in the facility or anything that is to be delivered or offered for use at an NRC-licensed
 
facility as a basic component, (2) whether the nonconformance constitutes a deviation or failure to comply (with the potential for creating a substantial safety hazard), and (3) whether any affected goods or services are installed and/or in use and/or have been delivered or offered for use, such that if not, the problem could
 
be corrected before their being delivered or offered for use.
Provide descriptions of the following specific aspects of the Part 21 program: *A description of how the applicant/holder assures compliance with posting requirements of 10 CFR Part 21 relative to the reporting of defects and non-
 
compliances.*A description of the requirements and documented process for inclusion of 10 CFR Part 21 requirements in procurement documents for basic components.*A description of the requirements and documented process for meeting the 10 CFR PART 21 requirements for notification for failures to comply or existence of
 
a defect and its evaluation, including the generation of a written report per
 
10 CFR 21.21(d)(4), and a description of the criteria used in the evaluation of
 
failures to comply and/or existence of defects in accordance with the regulation.*A description of the measures to ensure that records necessary to document the applicant's compliance with 10 CFR Part 21 are prepared, maintained, and made
 
available for inspection. I.17.5.3.W.COMMERCIAL-GRADE DEDICATION (NOT APPLICABLE TO ESP AND DC APPLICANTS)
Provide a description of the commercial-grade dedication program in sufficient detail to demonstrate how it meets the requirements of 10 CFR Part 21 and the applicable requirements of Criteria I though XVIII of Appendix B, "Quality Assurance Criteria for Nuclear Power Plants
 
and Fuel Reprocessing Plants," to 10 CFR Part 50, "Domestic Licensing of Production and
 
Utilization Facilities."
Refer to draft SRP Section 17.5.W for more specific detail on the applicable items within each criterion that must be described as a minimum.I.17.5.3.X.DIGITAL EQUIPMENT SOFTWARE VERIFICATION AND VALIDATION QUALITY CONTROLS Provide a description of the controls and measures used to assure the QA program addresses quality controls for digital equipment software (software-based devices) used in safety-related systems, including:*A description of the measures to ensure digital equipment meets the DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 24 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 requirements of 10 CFR Part 50 Appendix B, including a description of measures within the following areas taken to ensure appropriate quality controls for digital
 
equipment software are established and implemented:*Organization, including management responsibilities and training and qualification requirements for personnel involved in digital equipment software
 
activities*QA Program, including procedures for quality controls, supplier quality assurance programs, and verification and validation requirements*Design Control, including program requirements for (as well as evaluation of vendor programs for) software/hardware configuration control, documented
 
procedures, failure analyses, verification, validation, and testing activities during
 
the software development life cycles, and operating history data. *Procurement document control and commercial-grade dedication
*Test Control
*Corrective Action
*Audits
*A description of the standards to which the applicant/holder is committed and ensures appropriate suppliers are committed, for digital equipment software
 
verification and validation quality controls, including:
: a. Institute of Electrical and Electronics Engineers (IEEE) Std 1012-1998, "IEEE Standard for Software Verification and Validation," endorsed by RG 1.168.
: b. Electric Power Research Institute (EPRI) NP-5652, "Guideline for the Utilization of Commercial-Grade Items in Nuclear Safety Related Applications (NCIG-07)," as conditionally endorsed by Generic Letter (GL) 89-02, "Actions to
 
Improve the Detection of Counterfeit and Fraudulently Marked Products," and
 
with the NRC staff positions promulgated in GL 91-05, "Licensee Procurement
 
and Dedication Programs," for the procurement of commercial-grade services
 
related to digital equipment.I.17.5.3.Y.NONSAFETY-RELATED SSC QUALITY CONTROLS (NOT APPLICABLE TO ESP APPLICANTS)
Design Certification Applicant:
 
Provide a description of any specific measures and controls established within each of the 18 criteria of 10 CFR Part 50, Appendix B, appropriate to risk significant, nonsafety related
 
structures, systems, and components (SSCs).
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 25 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 Considering the guidance available in draft SRP Section 17.5.Y., describe and provide justification for any exceptions or alternatives to the specific criteria in draft SRP Section 17.5.Y.
COL Applicant or COL Holder:
NOTE: The COL applicant or holder need only address aspects of the program not addressed by the DCD applicant).
Describe how the QAPD addresses the documents listed below for risk significant nonsafety related SSCs. Provide a description of and justification for exceptions or alternatives to the
 
specific criteria in any of these documents, with the exception of requirements that are in the design control document (DCD), which would require Commission approval of an exemption:*The quality requirements for the fire protection system in accordance with Regulatory Position 1.7, "Quality Assurance," in RG 1.189, "Fire Protection for
 
Operating Nuclear Power Plants."*The quality requirements for anticipated transient without scram (ATWS) equipment in accordance with Generic Letter 85-06, "Quality Assurance
 
Guidance for ATWS Equipment That Is Not Safety Related."*The quality requirements for station blackout (SBO) equipment in accordance with Regulatory Position 3.5, "Quality Assurance and Specific Guidance for SBO
 
Equipment That Is Not Safety Related," and Appendix A, "Quality Assurance
 
Guidance for Non-Safety Systems and Equipment," in RG 1.155, "Station
 
Blackout."
Describe how the QA requirements for nonsafety related SSCs in the DCD for the design and construction phase, are specified in the QAPD for the operational phase.
Describe how the QAPD addresses cause determinations and corrective actions for design and operational errors that degrade nonsafety-related, risk-significant SSCs.I.17.5.3.Z.INDEPENDENT REVIEW
 
This section is applicable to holders of a COL (operational phase).
 
Provide a description of the program, proce ss, membership and qualification requirements, management review and approval, and other requirements, including the scope and required
 
content of independent reviews, using either the Independent Review Body or Independent
 
Review Committee approaches.
Include in the description of the scope of independent reviews a description of the specific types of reviews, such as propose changes, tests, and experiments, proposed technical specification
 
changes and license amendments, violations, deviations and reportable events, nuclear safety
 
matters, corrective actions for significant conditions adverse to quality, and results of all assessments.
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 26 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006I.17.6DESCRIPTION OF APPLICANT'S PROGRAM FOR IMPLEMENTATION 10 CFR 50.65, THE MAINTENANCE RULE 1.0  Describe program procedures for Maintenance Rule implementation in accordance with NUMARC 93-01 as endorsed by Regulatory Guide 1.160, including, but not limited to the
 
following areas:
Note 1: Deviations from the guidance in NUMARC 93-01 and RG 1.160 should be explained and justified Note 2: While the Maintenance Rule does not require procedures or documentation, the NRC needs this information to obtain reasonable assurance of consistent compliance.1.1Scoping per 10 CFR 50.65(b):  List and provide information on the structures, systems, or components (SSCs) within the scope of your proposed Maintenance Rule (MR)
 
program in the format of a full-relational database using the template provided by the
 
NRC. For each SSC in scope, provide the following as database fields:1.1.1Specific MR requirement(s) in 50.65(b) that require it to be in scope. Provide a data field for each subparagraph, i.e., (b)(1)(i), (b)(1)(ii), (b)(1)(iii), (b)(2)(i), (b)(2)(ii), (b)(2)(iii)1.1.2For each SSC record, indicate in each paragraph (b) field the function(s) that require the SSC to be in scope1.1.3For each SSC record, indicate in each paragraph (b) field, as applicable, the failure modes and effects that required the SSC to be in scope1.1.4For each SSC scoping function or vulnerability, indicate the functional performance requirements/success criteria and/or functional failure definitions and implications.1.1.5Identify each SSC explicitly mentioned in the EOPs (including those mentioned in referenced procedures) that is not in the MR scope. Describe the basis for its exclusion
 
from scope including the basis for its inclusion in the EOPs, the portion of any and all
 
mitigating functions provided, the expectation of reliability in this(ese) application(s), and
 
the means by which operators are alerted (e.g., procedural warnings, cautions, disclaimers, signs, etc.) to reduced assurance or expectation of reliability.1.2For each SSC, indicate its reactor safety significance classification (i.e., HSS or LSS) and the basis thereof, including risk metrics and values, IOE, vendor information, and
 
any other factors considered by the expert panel.1.3Procedures:  Identify and describe the program procedures and documents (including computer software and data) that prescribe or govern scoping, including the items
 
above. Include status in procedural hierarchy, whether treated as safety-related or non-
 
safety-related, level of compliance expected, responsibility for preparation, review, approval, use, compliance oversight, and disposition.2.0Monitoring per 10 CFR 50.65(a):
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 27 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 For each SSC, indicate its standby or continuously operating status and associated type (i.e., availability, reliability, or condition) and leve l (i.e., component, system, pseudo-system, train, or plant) of monitoring/tracking.2.0.1Identify SSCs or equipment (e.g., circuit breakers, motorized valve actuators, etc.)
monitored/tracked at the component level or in special component classes or "pseudo
 
systems" that may involve applications in multiple systems and the bases thereof (e.g.
 
IOE, common failure modes, etc). Explai n how the program identifies and treats such SSCs.2.1Indicate which SSCs', if any, performance or condition will be monitored initially per paragraph 50.65(a)(1)2.1.1For each SSC to be in (a)(1) status, describe the performance monitoring (availability and reliability) or condition monitoring goals and the basis thereof. Discuss the extent to
 
which the goals are commensurate with safety and what IOE was taken into account.2.1.2Corrective Action: Provide procedures which require prompt, comprehensive and thorough corrective action that addresses the proximate and ultimate causes of
 
degraded performance or condition, that encompasses the extent of condition, and that
 
institutes preventive measures including changes that may be required in maintenance
 
and/or maintenance support practices, procedures and training.2.1.3Although not currently required by the MR, describe the extent to which any (a)(1) goals may be commensurate with radiation safety or offsite release control requirements (non-
 
DBE), i.e., to what extent and how they might be able to adequately monitor the
 
performance or condition of the SSC with respect to any collateral radioactivity control
 
function(s), whether active or passive, that the SSC might have.2.1.4Procedures:  Identify and describe the program procedures and documents (including computer software and data) that prescribe or govern monitoring under (a)(1), including
 
the items above. Describe how the procedures address disposition of SSCs that do not
 
meet goals, including administration of corrective action. Include status in procedural
 
hierarchy, whether treated as safety-related or non-safety-related, level of compliance
 
expected, responsibility for preparation, review, approval, use, compliance oversight, and disposition.2.1.5Policies:  Describe any plant management po licies, procedures or practices that involve the (a)(1) status of MR SSCs, e.g., for MR staff performance evaluation, etc.2.2Identify which SSCs will be tracked to demonstrate effective control of their performance or condition under 50.65(a)(2).2.2.1For each SSC to be in (a)(2) status, describe its performance (availability and/or reliability) criteria or condition monitoring criteria and the bases thereof. Discuss the
 
extent to which they are consistent with industry guidance (as endorsed by NRC),
commensurate with safety (including PRA insights) and good engineering practice, reasonable and sensible, etc., i.e., achievable and sufficiently sensitive to degraded DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 28 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 performance or condition) such that meeting them could adequately demonstrate effective control of the performance of the SSC through appropriate preventive
 
maintenance and such that the SSC would remain capable of performing its function(s)
 
and not fail in a manner adverse to safety. Deviations from industry guidance should be
 
explained.
2.2.1.1  For each reliability performance criterion, describe how the program defines and determines/identifies and treats functional failures, MR functional failures (MRFFs),
maintenance-preventable functional failures (MPFFs), and repetitive MPFFs.
2.2.1.2  For each availability performance criterion, describe how the program defines and tracks availability or unavailability (planned and unplanned), including exceptions and
 
credits and the basis thereof.
2.2.1.3  For each condition monitoring criterion, describe how the program addresses sensing, surveillance, tracking & trending, action levels (predictive maintenance), etc.
2.2.1.3  For each SSC categorized in a "run-to-failure" status, if any, describe the bases and treatment for this categorization, including (a) SSC function(s) and success/failure
 
criteria, (b) ability to detect degradation in performance or condition prior to failure, (c)
 
ability to predict failure based on IOE (e.g., average failure rates, application
 
vulnerabilities, MTBFs, etc.) and vendor information, (d) consequences of failure (modes, effects, safety significance), both with and without prompt detection and
 
correction/repair or replacement, (e) ability promptly to detect failure (e.g., self
 
revealing?), (f) means to ensure prompt identification and resolution, (g) procedures for
 
identification and disposition of excessive failure rates (including vendor interaction).2.2.2Performance criteria or condition monitoring criteria under (a)(2), although not currently required by the MR, may be evaluated to determine the extent to which they could also
 
be reasonably expected to demonstrate effective control of any collateral radioactivity
 
control function(s), whether active or passive, that the SSC might have.2.2.3Procedures:  Identify and describe the program procedures and documents (including computer software and data) that prescribe or govern tracking under (a)(2), including the
 
items above. Describe how procedures govern disposition of SSCs for which effective control of performance or condition is not demonstrated (including not meeting
 
performance criteria or condition monitoring criteria). Address conditions under which
 
the expert panel may justify not placing an SSC in (a)(1) status. Include status in
 
procedural hierarchy, whether treated as safety-related or non-safety-related, level of
 
compliance expected, responsibility for preparation, review, approval, use, compliance
 
oversight, and disposition.
3.0 Periodic Evaluation per 10 CFR 50.65(a)(3):
Identify and describe the program procedures and documents (including computer software and data) that prescribe or govern periodic evaluation of the Maintenance Rule program in
 
accordance with 50.65(a)(3).
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 29 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/20063.1Describe how procedures govern the scheduling and timely performance of (a)(3) evaluations3.2Documenting, reviewing and approving eval uations, providing and implementing results3.3Making adjustments to achieve or restore balance between reliability and availability 3.4Industry operating experience (IOE) 3.4.1 Obtaining IOE Information, including information from NRC, INPO, EPRI and EPRI-sponsored organizations (e.g., the MRUG, CRMF, CBUGs, etc.), NSSS owners groups, other owners and users groups, and vendors (e.g., the VETIP, or other programs
 
established pursuant to NRC GL 83-28, Section 2.2)3.4.2 Processing IOE Information, including admin controls, routing/distribution, applicability screening and engineering/technical staff involvement3.4.3 Implementing/using IOE Information, including corrective action, maintenance, testing and inspection changes, modifications, improv ements, procedures, practices, training, qualification and IOE feedback to the processes for safety significance classification, monitoring or tracking type and level determination, goal setting and
 
performance/condition criteria development, procurement engineering (e.g., receipt
 
criteria, commercial-grade dedication), and material handling, storage, issue 4.0  Risk Assessment and Management per 10 CFR 50.65(a)(4):
Identify and describe the program procedures and documents (including computer software and data) that prescribe or govern maintenanc e risk assessment and management accordance with 50.65(a)(4) including, but not limited to the following areas: 4.1Determination of the scope (or limited scope) of SSCs to be included in (a)(4) riskassessments4.2Risk assessment and management during work planning 4.3Risk assessment and management of emergent conditions and updating risk assessments as maintenance situations and plant conditions and configurations are
 
changed.4.4Assessment (quantitative and qualitativ e capabilities) and management of risk of external events or conditions, including fire (internal, external and fire-risk-sensitive
 
maintenance activities), severe weather, ex ternal flooding, landslides, seismic activity and other natural phenomena; grid/offsite power reliability for grid-risk-sensitive
 
maintenance activities (respond to or refer to responses to MR-related questions in NRC GL 2006-02), and internal flooding.4.5 Assessment and management of risk of maintenance activities affecting containment DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 30 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 integrity.4.6Assessment and management of risk of maintenance activities when at low power or when shut down (including implementation of NUMARC 91-06).4.7Assessment and management of risk associated with the installation of plant modifications and assessment and management of risk associated with temporary
 
modifications in support of maintenance activities (in lieu of screening in accordance
 
with 10 CFR 50.59), in accordance with latest revision of NEI 96-07 as endorsed by
 
latest revision of RG 1.187.4.8  Risk assessment and management associated with risk-informed technical specifications.5.0Maintenance Rule Training and Qualification:
Describe the program, including procedures and documentation, for Maintenance Rule training
 
and qualification of the following personnel: (Note: While the Maintenance Rule does not require training and qualification, the NRC needs this information to obtain reasonable assurance of consistent compliance.)5.1Selection, Training and Qualification of Maintenance Rule Personnel5.1.1The Maintenance Rule Coordinator 5.1.2The Maintenance Rule Expert Panel5.2Training and Qualification of Engineering Personnel5.2.1System/Component Engineers 5.2.2Procurement Engineers 5.2.3Maintenance Engineers 5.2.4Probabilistic Risk Analysts/Safety Assessors 5.3Training and Qualification of Maintenance Personnel5.3.1Work Planners 5.3.2Maintenance Foremen and Shop Supervisors 5.3.3Technicians and Craftsmen5.4Training and Qualification of Operations Personnel5.4.1Shift Supervisors 5.4.2Shift Technical Advisors 5.4.3Senior Reactor Operators 5.4.4Reactor Operators 5.4.5Plant Operators5.5Training and Qualification of Licensing Personnel 5.6Basic Indoctrination of New Personnel 5.7Management Training 6.0 Maintenance Rule Program and Operational Reliability Assurance Program Interface:
 
Describe the relationship and interface between MR and ORAP (See Section C.I.17.4), including how functions are coordinated and procedures overlap and/or are cross referenced.
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 31 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 7.0 Maintenance Rule Program Implementation:
Describe the plan or process for implementing the MR program as described in the COL application, including sequence and milestones for establishing program elements, commencing
 
monitoring or tracking of performance and/or condition of SSCs as they become operational.
DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 32 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006I.17.7LIST OF REFERENCES*10 CFR Part 21*10 CFR Part 50*10 CFR 50.4
*10 CFR 50.34(a)(7)
*10 CFR 50.34(b)(6)(ii)
*10 CFR 50.34(f)(3)(ii)
*10 CFR 50.34(f)(3)(iii)
*10 CFR 50.34(g)
*10 CFR 50.54(a)
*10 CFR 50.55(e)(4)
*10 CFR 50.55(f)
*10 CFR 50.55a(b)(1)(iv)
*10 CFR 50.55a(b)(2)(x)
*10 CFR 50.55a(b)(3)(I)
*10 CFR 50.65
*10 CFR Part 50, Appendix B*10 CFR Part 52*10 CFR 52.47(a)(1)  [cross references to other regulatory requirements]
*10 CFR 52.79  [cross references to other regulatory requirements]
*10 CFR 52.81  [cross references to other regulatory requirements]
*10 CFR 52.83  [cross references to other regulatory requirements]
Regulatory Guidance Documents*NUREG-0800, "Standard Review Plan"
*RS-002, "Processing Applications for Early Site Permits," May 2004
*RIS 00-018 "Guidance on Managing Quality Assurance Records in Electronic Media"*RG 1.189, "Fire Protection for Operating Nuclear Power Plants"
*RG 1.155, "Station Blackout"
*RG 1.26, "Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants"*RG 1.29, "Seismic Design Classification"
*RG 1.54, "Service Level I, II, and III Protective Coatings Applied to Nuclear Power Plants"*RG 1.97, "Instrumentation for Light-Water Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident"*RG 1.142 Revision 2, "Safety-Related Concrete Structures for Nuclear Power Plants (Other Than Reactor Vessels and Containments)" (11/01)*RG 1.143, "Design Guidance for Radioactive Waste Management Systems, Structures, and Components Installed in Light-Water-Cooled Nuclear Power
 
Plants"*RG 1.152, "Criteria for Digital Computers in Safety Systems of Nuclear Power Plants"*RG 1.160, "Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," Revision 2, March 1997 DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 33 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006*RG 1.168, "Verification, Validation, Reviews, and Audits for Digital Computer Software Uses in Safety Systems of Nuclear Power Plants"*RG 1.169, "Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"*RG 1.170, "Software Test Documentation for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"*RG 1.171, "Software Unit Testing for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"*RG 1.172, "Software Requirements Specifications for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"*RG 1.173, "Developing Software Live Cycle Processes for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"*RG 1.182, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants," May 2000*RG 1.200, "An Approach for Determining the Technical Adequacy of ProbabilisticRisk Assessment Results for Risk-Informed Activities"*RG 4.15, "Quality Assurance for Radiological Monitoring Programs (Normal Operations) - Effluent Streams and the Environment"*RG 7.10, "Establishing Quality Assurance Programs for Packaging Used in Transport of Radioactive Material"*NUMARC 93-01, "Industry Guidance for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," Revision 2, dated April 1996*February 22, 2000, revision to Section 11 of NUMARC 93-01, "Assessment of Risk Resulting from Performance of Maintenance Activities."*NUREG 1070, "NRC Policy on Future Reactor Designs," July 1985
*NUREG 1462, "Final Safety Evaluation Report Related to the Certification of the System 80+ Design," August 1994*NUREG 1503, "Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design," July 1994*NUREG 1512, "Final Safety Evaluation Report Related to the Certification of the AP600 Standard Design," September 1998*NUREG 1793, "Final Safety Evaluation Report Related to the Certification of the AP1000 Standard Design," September 2004*NUREG/CR 3385, "Measures of Risk Importance and Their Applications," May 1986 Generic Letters:*Generic Letter 83-28, "Required Actions Based on Generic Implications of Salem ATWS Events," July 8, 1983*Generic Letter 85-06, "Quality Assurance Guidance for ATWS Equipment That Is Not Safety Related," January 16, 1985*Generic Letter 89-02, "Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products," March 21, 1989*Generic Letter 91-05, "Licensee Commercial-Grade Procurement and Dedication Programs," April 9, 1991*Generic Letter 2006-02, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power," February 1, 2006 DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 34 of 34 DRAFT WORK-IN-PROGRESS                                                                    DATE: 05/05/2006 Commission Papers*SECY 89-013, "Design Requirements Related to the Evolutionary Advanced Light-Water Reactors (ALWR)," January 19, 1989*SECY 93-087, "Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light-Water Reactor Designs," April 2, 1993*SECY 94-084, "Policy and Technical Issues Associated with Regulatory Treatment of Non-Safety Systems in Passive Plant Designs," March 28, 1994
 
and related Staff Requirements Memorandum, dated June 30, 1994*SECY 95-132, "Policy and Technical Issues Associated with Regulatory Treatment of Non-Safety Systems (RTNSS) in Passive Plant Designs," May 22, 1995}}

Revision as of 08:32, 31 August 2018

Draft COL Application Regulatory Guide, Part 1, Chapter 17, Quality Assurance.
ML060410002
Person / Time
Issue date: 05/05/2006
From: Thorp J E
NRC/NRR/ADRA/DNRL
To:
Thorp, J, NRR/ADRA/DNRL/NRBA, 415-6584
References
DG-1145, TAC MC8945
Download: ML060410002 (23)


Text

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 1 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 I.17 QUALITY ASSURANCE & RELIABILITY ASSURANCE Consistent with the approach taken in the new update to Chapter 17 of the Standard Review Plan, Sections I.17.1, I.17.1.1, I.17.2, and I.17.3 of this chapter point the reader to Section I.17.5

for the required format and content of a QA program during design, construction, and operation.I.17.1 Quality Assurance During the Design and Construction Phase

COL applicants should refer to Section I.17.5 for a complete discussion of the required format and content of a QA program during design, construction, and operation.

I.17.1.1 Early Site Permit Quality Assurance Measures

COL applicants should refer to Section I.17.5 for a complete discussion of acceptable format and content of a QA program during design, construction, and operation. This section will

identify those aspects of a QAPD associated with Early Site Permits, versus other applications, such as Design Certification and COL.I.17.2Quality Assurance during the Operations Phase

COL applicants should refer to Section I.17.5 for a complete discussion of acceptable format and content of a QA program during design, construction, and operation.I.17.3Quality Assurance Program Description

COL applicants should refer to Section I.17.5 for a complete discussion of acceptable format and content of a QA program during design, construction, and operation.

I.17.4 Reliability Assurance Program Guidance

I.17.4.1 Reliability Assurance Program (RAP) Introduction and General Requirements

The scope of the RAP includes risk-significant structures, systems, and components (SSCs), both safety related and nonsafety related SSCs, that provide defense in depth or result in

significant improvement in the probabilistic risk assessment (PRA) evaluations. The RAP is implemented in two stages. The first stage, the design RAP (D-RAP), applies to reliability

assurance activities that occur before the initial fuel load. The objective of the D-RAP is to

design reliability into the plant consistent with the NRC-established PRA safety goals. The

second stage, the operational RAP (O-RAP), applies to reliability assurance activities for the

operations phase of the plant life cycle. The goal of the combined license (COL) applicant's O-

RAP is to maintain reliability consistent with the overall safety goals. Individual component

reliability values are expected to change throughout the course of plant life because of aging

and changes in suppliers and technology. Changes in individual component reliability values

are acceptable as long as overall plant safety performance is maintained within the NRC-

established PRA safety goals and deterministic licensing design basis.

The D-RAP is implemented in several phases. The first phase implements the aspects of the program that apply to the design process. During this phase, risk-significant SSCs are identified DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 2 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 for inclusion in the program by using probabilistic, deterministic, and other methods. The design certification applicant performs this phase. The design certification D-RAP is verified via the

inspection process and the NRC safety evaluation review process. The second phase is the

site-specific phase, which introduces the plant's site-specific SSCs to the D-RAP process. The

COL applicant performs this phase. At this stage, the D-RAP is modified or appended based on

considerations specific to the site. The COL applicant establishes the PRA importance

measures, the expert panel process, and other deterministic methods to determine and maintain

the site specific list of SSCs under the scope of RAP. The COL applicant's D-RAP is verified via

the inspection process, the NRC safety evaluation review process, and the D-RAP inspection, test, analysis, and acceptance criteria (ITAAC).

The design certification applicant is also responsible for developing D-RAP ITAAC. The design certification D-RAP ITAAC will be verified by the NRC safety evaluation review process. The

COL holder is responsible for completing the D-RAP ITAAC. Satisfactory completion of the

D-RAP ITAAC is verified by IP 65001, "ITAAC Matrix Inspections."

The COL applicant is responsible for developing and implementing the O-RAP which is an operational program. The applicant's O-RAP is verified via the inspection process, the NRC

safety evaluation review process, and the licensing condition process.

The following is intended to provide guidance to applicants. Except in those cases in which the applicant proposes an acceptable alternative method for complying with specified portions of

the Commission's regulations, the methods described herein will be used by the staff in its

evaluation of conformance with Commission regulations.

The provisions of this SRP section apply to reviews of COL applications under 10 CFR Part 52 docketed 6 months or more after the date of issuance of this SRP section.

Any exceptions or alternatives to this SRP section will be reviewed to ensure that they are defined and that an adequate basis exists for their acceptance. When required, the staff will

prepare a request for additional information for the applicant and review the response for

acceptability.

I.17.4.2 Staff Review of the RAP at COL Application Phase

The following is provided to give the COL applicant insight into staff focus areas during review of the COL application:1.The staff reviews the process used by the applicant for identifying site-specific risk-significant SSCs and determines if the applicant has properly identified the site-specific

risk-significant SSCs.2.The staff reviews and inspects the applicant's QA controls for developing and implementing the D-RAP.3.The staff reviews the D-RAP (scope, purpose, objectives, and essential elements).

4.The reviews the O-RAP (scope, purpose, objectives, and essential elements) .

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance 1 RAW is the increase in risk if the SSC is assumed to be failed for all failure modes (e.g., failure to start, failure to run). See NUREG/CR-3385 for additional details.

2 RRW is the decrease in risk if the SSC is assumed to be perfectly reliable for all failure modes (e.g., failure to start, failure to run). See NUREG/CR-3385 for additional details.

3 FVI is related to RRW on a ratio scale. See NUREG/CR-3385 for additional details.

Pg 3 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/20065.The staff's overall acceptance criteria is that the RAP is fully described the COL applicant's Final Safety Analysis Report (FSAR).

I.17.4.3 COL Applicant RAP Information Requirements

The COL applicant should include the following information in the FSAR submittal. The COL applicant should focus information on the site-specific risk-significant SSCs:

I.17.4.3.1 The scope, purpose, objectives and essential elements of the D-RAP.

I.17.4.3.2 A description of the process for identifying and prioritizing SSCs based on risk significance. The description should address the following:a.The dominant failure modes should be identified and prioritized.

b.Identify the effects associated with those failure modes and subsequent component failure prevention or mitigation.c.The role industry experience, analytical models, and expert panel contributed in categorizing the safety significance of SSCs. d.The key assumptions and determinations of risk significance that are derived from probabilistic, deterministic, or other methods that consider operations, maintenance, and monitoring activities for identifying component reliability and

failure data.e.The expert panel qualifications in the areas of personnel knowledgeable in the systems, operations, and maintenance of a plant, and experience necessary to

perform the SSC selections.f.The applicant's use of a combination of PRA importance measures for RAW 1 , and RRW 2 or FVI 3.I.17.4.3.3 A description of the operating experience used to define the significant failure modes and their likely causes and reliability. For exam ple, reliability analyses can be performed using common databases from industry sources such as Institute of Nuclear Power Operations and

the Electrical Power Research Institute.

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 4 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 I.17.4.3.4 The applicant should describe the controls for the RAP. The description should address the following:a.The organization responsible for formulating and implementing the RAP.

b.The management staff responsible for the design and licensing.

c.The coordination of program activities, including those performed within the design organization as well as work completed by the architect-engineers and

other supporting organizations.d.The risk and reliability organization within the design organization responsible for developing the RAP and access to the design staff.e.The interface between the risk and reliability organization and the design organization for determining that the performance of risk-significant SSCs relate

to the reliability assumptions in the PRA.(1)How the reliability organization and the design organization manage interface issues.(2)The risk and reliability organization methods for keeping the design staff cognizant of risk-significant items, program needs, and status.(3)The risk and reliability organization participation in the design change control process for the purpose of providing RAP related inputs in the

design process.(4)The risk and reliability organization involvement in design reviews.f.Engineering controls applied for determining SSCs within the scope of the RAP.

g.How procurement and fabrication specifications reflect the reliability values assumed in the PRA.h.Procedural controls applied to the D-RAP program.

i.Storage and retrieval controls applied to documentation of the RAP program.

j.Corrective action controls applied to RAP SSCs.k.The process for proposing an alternative design to improve performance in either area. For example, is the revised design reviewed to provide confidence that the

current assumptions in the other areas are not violated. When a potential conflict

exists between safety goals and other goals, do safety goals take precedence?l.The proposed design feedback process used to ensure that the design DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 5 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 organization determines that significant design assumptions related to equipment reliability and unavailability are realistic and achievable. Does the design

feedback process include the methodology used to consider industry experience, analytical models, and existing requirements for the PRA dominant failure

modes?m.QA requirements implemented during the procurement, fabrication, installation, construction, and testing of risk-significant SSCs.

I.17.4.3.5 A D-RAP ITAAC that provides reasonable assurance that the design of risk-significant SSCs is consistent with their risk analysis assumption. The ITAAC acceptance

criteria should ensure that the estimated reliability of each as-built risk-significant SSC is at least

equal to the assumed design reliability and that industry experience including operations, maintenance, and monitoring activities were assessed in estimating the reliability of these

SSCs.I.17.4.3.6 Any design and operational information to be used by the COL applicant for plant reliability assurance activities. This information may include possible failure modes and

suggestions for failure prevention or mitigation.

I.17.4.3.7 A description of how the O-RAP is integrated into existing programs (e.g., maintenance, surveillance testing, inservice inspection, inservice testing, and QA). The

description should address the following:a.How reliability performance goals for risk-significant SSCs would be established consistent with the existing maintenance and QA processes on the basis of

information from the D-RAP.b.Performance and condition monitoring requirements that provide reasonable assurance that risk-significant SSCs do not degrade to an unacceptable level

during plant operation. Implementation of the maintenance rule following the

guidance contained in Regulatory Guide 1.160, "Monitoring the Effectiveness of

Maintenance at Nuclear Power Plants," meets the objective of reliability

assurance for monitoring and correcting degradation in SSC reliability or

availability. c.The feedback mechanism for periodically reevaluating risk significance on the basis of actual equipment, train, or system performance. (The reliability

performance monitoring does not need to statistically verify the numerical values

used in the PRA. However, it provides a feedback mechanism for periodically

reevaluating risk significance on the basis of actual equipment, train, or system

performance.)d.Any reliability assurance activities incorporated into the maintenance rule, 10 CFR 50.65, the QA, surveillance, inservice inspection, inservice testing, and

technical specification allowable outage time programs.

I.17.4.3.8 The administrative processes and proc edures for providing corrective actions for DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 6 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 design and operational errors that degrade nonsafety-related, risk-significant SSCs.

I.17.4.3.9 Any maintenance assessments or recommendations for risk-significant SSCs to enhance reliability.

I.17.4.3.10 A licensing condition stating that the O-RAP will be fully implemented prior to loading fuel.I.17.4.4NonSafety Systems

Regulatory Treatment of Non-Safety Systems (RTNSS) is a program for nonsafety related SSCs that are important to safety and covers passive plant designs, such as the Westinghouse

AP1000. Combined license (COL) applicants should refer to the guidance on nonsafety

systems that are safety significant, found in paragraph "Y" of Section 17.5.3 of this chapter.

I.17.5 QUALITY ASSURANCE PROGRAM GUIDANCE

I.17.5.1 Introduction and General Requirements

An applicant is responsible for the establishment and execution of a quality assurance (QA) program applicable to activities during design, construction, pre-operational testing, and

operation of the nuclear power plant. An applicant's QA program is executed through a

hierarchy of written policies, procedures and instructions. The QA program must be established

at the earliest practical time consistent with the schedule for accomplishing an activity. The

quality assurance program description (QAPD) should be included in Chapter 17 of the Safety

Analysis Report (SAR) or, alternately, as a topical report incorporated by reference in the SAR.

The quality assurance program description is submitted in accordance with the provisions of 10 CFR 50.34 (referenced from 10 CFR 52.79). The program must meet the requirements of

Appendix B to 10 CFR Part 50. Although the format of the program description is left to the

discretion of the applicant, each of the Appendix B criteria must be addressed in sufficient detail

to enable the reviewer to determine whether and how each criteria is satisfied in accordance

with 10 CFR 50.34 and the bases documents of SRP Section 17.5. The inspection and survey

systems required by §50.55a, "Codes and Standards," of 10 CFR Part 50 may be used in partial

fulfillment of these requirements to the extent t hat they are shown by the description of the QA program to satisfy the applicable Appendix B requirements.

The submittal should describe a comprehensive quality assurance program applicable to design, construction, and operation. For multi-unit sites, the COL applicant should describe the

organizational arrangement and functions to meet the needs of the multiple units. The

discussion should include the extent to which the arrangement and functions are shared and a

descriptions of the divisions and/or controls established to preserve the integrity of individual

units and programs.

The objectives of pre-application QA interactions with the NRC are similar to those called for in ESP Inspection Manual Chapter 2501, and those identified in Inspection Procedure 35002-01, Early QA Meeting. Although NRC regulations do not require submittal of a QAPD in a pre-COL

application, it is recommended that applicants resolve design and construction QA issues in a DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 7 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 pre-application time frame. Operational QA issues could be deferred to the COL application.

NOTE: SRP Section 17.5 will be the principle guidance for NRC reviews of QAPD's submitted by applicants. SRP Sections 17.1, 17.2, and 17.3 will not be updated or used

by NRC reviewers for new plants.

SRP Section 17.5 describes a standard QA program for DC, ESP, CP, OL, and COL applicants and holders. SRP Section 17.5 is based on ASME Standard NQA-1 (1994 Edition); Regulatory

Guide (RG) 1.8, "Qualification and Training of Personnel for Nuclear Power Plants," Revision 3;

RG 1.28, "Quality Assurance Program Require ments (Design and Construction)," Revision 3; RG 1.33, "Quality Assurance Program Requirements (Operation)," Revision 2; and NRC Review

Standard (RS)-002, "Processing Applications for Early Site Permits."

NOTE: DC, ESP, and COL applicants are identified as an "applicant"; COL holders are identified as a "holder" throughout this chapter of the regulatory guide.

A QAPD submitted by an ESP applicant applies to site suitability activities and would be reviewed and evaluated by the NRC prior issuing the ESP.

A QAPD submitted by a DC applicant addresses design QA in support of a DC; it would not address activities that occur subsequent to the beginning of construction. The NRC would

evaluate the QAPD submitted by the DC applicant prior to approval of the DC.

A QAPD submitted by a COL applicant applies to all phases of a facility's life, including design, construction, and operation. COL applicants referencing a DC must address the COL items

identified in Chapter 17 of the referenced generic DCD. A QAPD may be submitted in two

phases, the first phase to cover construction QA activities and the second to cover operational

QA activities. Where portions of the operational QA program have not been established at the

time the SAR is prepared, the description should provide a schedule for implementation and a

description of the transition process from the design/construction QA program to the operational

QA program. The NRC would evaluate the QAPD for the construction phase prior to issuing the

COL; the NRC would evaluate the QAPD for the operational phase prior to authorizing initial fuel

loading.The applicant's QA program(s) should incorporate the most recently NRC-endorsed QA standards. If an applicant chooses not to follow the standardized regulatory guidance in this

section, the QAPD should describe specific alternative methods to be used, how these

alternatives would be implemented, and the organi zations responsible for their implementation.

If an applicant elects to propose and justify using the existing QA program for its operating

"fleet," QA controls applicable to construction activities must be addressed Where a QAPD commits to follow the guidance of a regulatory guide, the QAPD should address how the guidance would be applied, the extent of applicability, and the organizational elements

responsible for implementing this guidance. The organizational elements should identify those

of the applicant, the architect-engineer, the nuclear steam system supplier, the constructor, and

the construction manager (if other than the constructor).

If the station incorporates, or plans to incorporate, other nuclear or nonnuclear power DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 8 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 generating facilities, interfaces with the other facilties should be described. The description should include any planned sharing of personnel, a description of their duties, and the

proportion of their time expected to be assigned to other units.

The QAPD should describe the extent to which the applicant will delegate the work of establishing and executing the QA program or any part thereof to other contractors. The QAPD

should clearly delineate those QA functions which are implemented within the applicant's QA

organization and those which are delegated to other organizations. The QAPD should describe

how the applicant will retain responsibility for and maintain control over those portions of the QA

program delegated to other organizations. The QAPD should identify the responsible

organization and the process for verifying that delegated QA functions are effectively

implemented. The QAPD should identify major work interfaces for activities affecting quality and describe how clear and effective lines of communication between the applicant and his

principal contractors are maintained to assure coordination and control of the QA program.

I.17.5.1.1 General Requirements for QAPD Information to be Provided:

Provide information on the controls to be used for the nuclear power plant, to include a discussion on how the applicable requirements of Appendix B will be satisfied for all phases of a

facility's life, including design, construction, operation, and modification. Describe how each of

the acceptance criteria is met.

Include an evaluation of the facility against the SRP in effect 6 months prior to the docket date of the application of a new facility. Alternatives to or differences from the SRP must be

identified and justified in the application.

Provide a description of the QA program for the design, fabrication, construction, and testing of the structures, systems, and component s (SSCs) important to safety.

Provide a description of the controls established to ensure reporting of defects or failures that are determined to be substantial safety hazards. Describe how reportable defects or

noncompliances are identified, evaluated, and reported under the 10 CFR Part 50, Appendix B, QA program and how the requirements of 10 CFR Part 21 and 10 CFR 50.55(e) are established

to ensure that substantial safety hazards are 1) evaluated, 2) subject to proper corrective action, and 3) identified to the NRC so it can evaluate the adequacy of corrective actions and consider

any generic implications.

Provide a description of the controls established to ensure compliance with 10 CFR 50.55a requirements that SSCs be designated, fabricated, erected, constructed, tested, and inspected

to quality standards commensurate with the importance of the safety function to be performed.

Provide a description of the controls established to ensure the requirements of 10 CFR 50.34(f)(3)(ii) and (iii) are met, so that:1)all SSCs important to safety are listed in accordance with Criterion II of Appendix B to 10 CFR Part 50, 2)independence exists between organizations performing checking functions and DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 9 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 those responsible for performing the function,3)QA is implemented during construction, 4)QA personnel are included in the documented review and concurrence in quality-related procedures,5)QA personnel are qualified, 6)sizing of the staff is commensurate with its duties and responsibilities, 7)procedures are established for maintenance of as-built documentation, 8)QA maintains a role in design and analysis activities, 9)criteria are established for QA programmatic requirements.

I.17.5.2 Organization of Section I.17.5.3

Section I.17.5.3 of this chapter is organized into the 26 areas (A through Z) listed below. Sections A through X apply to SSCs. Section Y applies only to nonsafety-related SSCs.

Sections A through Y apply to COL applicants and COL holders. Section Z applies only to

holders of a COL (operational phase). Areas not applicable to DC and ESP applicants are

annotated as such in Section 17.5.

A. ORGANIZATION B. QUALITY ASSURANCE PROGRAM

C. DESIGN CONTROL AND VERIFICATION

D. PROCUREMENT DOCUMENT CONTROL

E. INSTRUCTIONS, PROCEDURES, AND DRAWINGS

F. DOCUMENT CONTROL

G. CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES

H. IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, AND COMPONENTS

I. CONTROL OF SPECIAL PROCESSES

J. INSPECTION

K. TEST CONTROL

L. CONTROL OF MEASURING AND TEST EQUIPMENT

M. HANDLING, STORAGE, AND SHIPPING

N. INSPECTION, TEST, AND OPERATING STATUS

O. NONCONFORMING MATERIALS, PARTS, OR COMPONENTS DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 10 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 P. CORRECTIVE ACTION Q. RECORDS

R. AUDITS

S. TRAINING AND QUALIFICATION CRITERIA - QUALITY ASSURANCE (QA)

T. TRAINING AND QUALIFICATION - INSPECTION AND TEST

U. QA PROGRAM COMMITMENTS

V. 10 CFR PART 21 AND 10 CFR 50.55(e) PROGRAMS FOR REPORTING DEFECTS AND NONCOMPLIANCEW.COMMERCIAL GRADE DEDICATIONX.DIGITAL EQUIPMENT SOFTWARE VERIFICATION AND VALIDATION QUALITY CONTROLSY.NONSAFETY-RELATED SSC QUALITY CONTROLS Z.INDEPENDENT REVIEWI.17.5.3.A. ORGANIZATION Provide a written QAPD, issued at the most senior management level, that establishes the quality policy, commits the organization to implement it, and contains information meeting all the

detailed requirements of SRP Section 17.5, including:*A description of requirements that work is accomplished only by personnel qualified in accordance with written procedures, and that implementing

procedures are reviewed and approved by the managers responsible for their

implementation.*An organizational description that addresses the organizational structure, functional responsibilities, levels of authority, interfaces and associated

responsibilities, for all elements that function under the cognizance of the QA

program. (Onsite/offsite, operational, and maintenance organizational elements

are not applicable to DC applicants.)*A description of controls to ensure there is independence between persons and organizations performing activities and those executing verification and audit

activities.*A description of a management position with sufficient authority and organizational freedom to implement the QA program without undue influence

from cost and schedule considerations and refer appropriate matters to the top

management in a timely manner.*A description of QA program responsibility and authority to stop unsatisfactory work and control further processing, delivery, installation, or use of DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 11 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 nonconforming items. *A description of controls to assure proper delegation of responsibility and authority to carry out delegated portions of the program, while retaining licensee

responsibility for the program.I.17.5.3.B. QUALITY ASSURANCE PROGRAM

Provide information in the QAPD that descri bes the applicant's Quality Assurance Program, including:*A description of requirements for regular management, QA program participant, and senior management status and adequacy reviews of the QA program.*A description of the criteria used to identify the items and activities to which the QA program applies, and a list of the SSCs and/or activities under the control of

the QA program. *A description of the requirements for documenting the QA program through written policies, procedures, or instructions *A description of requirements for ensuring personnel are trained and resources provided before commencing any activity within the scope of the QA program. *A description of requirements for applicant/holder responsibility for the scope and implementation of an effective QA pr ogram and its binding applicability, even to management personnel responsible for costs and schedules.

Provide a commitment that documentation of QA program criteria, applicable SSCs and all activities controlled by the QA program will be established and maintained at the applicant or

holder's facility.I.17.5.3.C. DESIGN CONTROL AND VERIFICATION

Provide a description of the design control program that meets the requirements of SRP Section 17.5.C, including:*Description of a program with provisions to correctly control design inputs, processes, outputs, changes, interfaces, records, organizational interfaces and

documentation of design and design verifications.*Description of requirements ensuring the final design (approved design output documents and approved changes) identifies the assemblies and/or components

that are part of the item being designed.*Description of design process controls that ensure items and activities are selected and independently verified to ensure they are suitable for their intended

application, changes are subject to control measures commensurate with those DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 12 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 applied to the original design, and design information transmitted across interfaces is documented and effectively controlled.*Description of controls for adequacy of design records, documentation of design inputs, sources and design analyses, design analysis computer programs, design

calculations, and the legibility, reproducibility, storage and retrievability of design

documents.*Description of the means by which applicable information derived from experience, as set forth in reports or other documentation, is made available to

cognizant design personnel.*Description of the role of quality assurance in design and analysis activities

  • Description of the measures established for the selection and review for suitability of application of materials, parts, equipment, and processes that are

essential to the safety-related functions of the SSCs.*Description of the controls used to conduct design verification, including requirements for sufficiently detailed documentation relating design inputs to

design output products to allow verification, clear identification of the design

verifier. *Description of requirements for documentation of verification methods used, use of alternate calculations to verify appropriateness of inputs, assumptions, calculation methods, and/or computer programs. *Description of the types of questions used in design verification, including questions verifying:*Selection of design inputs

  • Description of assumptions necessary for the design activity
  • Appropriateness of design method(s)
  • Correct incorporation of design inputs
  • Documented specification of design inputs and verification requirements for interfacing organizations*Correct verification method(s)
  • Identification of appropriate acceptance criteria, including tolerances*Description of controls used when design adequacy is verified by qualification tests, including requirements for identification of tests, test conditions, design

features tested, documentation of test results, any modifications required as a DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 13 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 result of testing, retests, and model/mockup scaling, verification and error analysis in models/mockups*Description of controls for assuring completion of verification prior to use of designs, especially prior to irrevocable use, independence of verifier from

designer, verification of changes to design, including analysis of effects of

changes, and verification of applicability of standardized or previously approved

design, with respect to meeting pertinent design inputs, prior to each subsequent

application of a design. I.17.5.3.D. PROCUREMENT DOCUMENT CONTROL

Provide a description of the procurem ent document control program, including:*Description of controls to assure applicable technical, regulatory, administrative, and reporting requirements (such as specifications, codes, standards, tests, inspections, special processes, and 10 CFR Part 21, "Reporting of Defects and

Noncompliance," and 10 CFR 50.55(e)) are invoked for procurement of items

and services.*Description of the controls to assure procurement documents contain the appropriate information, including adminis trative items such as submission date as well as:*Scope of work statement

  • Specification of technical requirements and description of items or services to be furnished*Identification of test, inspection and acceptance requirements for monitoring supplier performance*Identification of the supplier's QA program
  • Access to supplier facilities and records
  • Requirements for documentation submission and reporting of defects and noncompliances*Description of controls applied to changes to procurement documents, including changes resulting from bid evaluation, negotiations or other actions, and

appropriate review of those changes by qualified personnel.I.17.5.3.E.INSTRUCTIONS, PROCEDURES, AND DRAWINGS (CONTROLLED DOCUMENTS)

Provide a description of controls to assure activities affecting quality are prescribed by and accomplished in accordance with documented instructions, procedures, or drawings, under DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 14 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 suitably controlled conditions.

Provide a description of controls to assure instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining satisfactory completion

of the given activity.I.17.5.3.F.DOCUMENT CONTROL

Describe the program established to control the development, review, approval, issue, use, and revision of documents. Include in the description the following:*Describe controls to assure the scope of the document control program is defined. *Describe controls for adequate review and approval of revisions to controlled documents by a knowledgeable, qualified organization, including controls to

assure access to pertinent background data or information necessary for

approval.*Describe controls to identify, prepare, review, approve, distribute, and require the use of new and revised controlled copies of instructions and procedural

documents and to control superseded documents. *Describe the means used to ensure controlled documents are adequate, complete and correct prior to distribution and use, including controls to ensure

QA review and concurrence on procedures for use on safety related SSCs. *Describe the requirements for frequency of periodic reviews, or the controls applied if procedure/document reviews will not be done on a periodic (i.e., every

2 year) basis. Include a description of the criteria and measures to ensure

changes, revisions and temporary changes receive the appropriate levels of

review by knowledgeable personnel. Include a description of controls for

processing minor changes not requiring the same levels of review and approval. *Describe control measures to prevent use of outdated or inappropriate documents, including:a.identifying the proper document to be used in performing the activityb.coordinating and controlling interface documents c.ascertaining that proper documents are being used*Describe provisions for systematic review and feedback for improvement of procedures in current use.I.17.5.3.G.CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES

Provide a description of the quality assurance program established to ensure that purchased items and services, including spare and replacement parts, are of acceptable quality, and are DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 15 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 suitable for their intended purpose. Include in this description the following:*Describe the provisions for evaluation, selection, and means to assured continued acceptability of qualified suppliers and the products and services they

provide.*Describe provisions for accepting purchased items and services, and for verifying procurement, inspection, and applicable test requirements have been satisfied

before using or placing a procured item in service.*Describe the documentation of procurement activities, demonstrating a systematic approach to the procurement process, identification of procurement methods, and organizational responsibilities. Include a description of the

measures used to evaluate and select procurement sources and document the

results from these activities.*Describe the established measures to interface with the supplier and to verify the supplier's performance, including measures to assure clear understanding of

purchase order requirements, exchange documented information, evaluate and process changes, modifications and exceptions, conduct document reviews, verifications, surveillance activities and inspections at supplier premises, add or modify design criteria, and firmly establish supplier responsibility for achieving

quality requirements.

In cases involving procurement of services only, describe the methods used to accept services from suppliers.*Describe the controls, requirements, and organizational processes established for reporting, documenting, processing, reviewing, approving and/or correcting

supplier nonconformances, including nonconforming items.*Describe methods used to accept an item or related service from a supplier, and to verify the quality of a product or service. Include in the description the criteria

and information that are included in the documentation (e.g., certificates of

compliance and conformance, receipt inspection and or test documents)

associated with acceptance and verification.*Describe controls to assure that program requirements apply and are extended to all phases of procurement and levels of suppliers. Include in the description

the reviews of procurement documents and changes to them to ensure that

documents transmitted to the prospective supplier(s) include appropriate

provisions for ensuring that items or services will meet the specified requirements.*Describe the criteria for use, the processes and controls applied to the means for assuring purchase requirements are met, including surveillance, source

verification, receipt inspection, and post-installation testing.

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 16 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006I.17.5.3.H.IDENTIFICATION AND CONTROL OF MATERIALS, PARTS, AND COMPONENTS*Describe the controls, methods, and documentation used to assure that items (consumables, items with limited shelf life, materials, parts, and components, including partially fabricated assemblies) are clearly identified, traceable to

manufacturing documentation and specifications, and controlled from initial

receipt and fabrication up to and including installation and use, to prevent the use

of incorrect or defective items. Include a description of provisions to ensure

identification of items is consistent with the planned duration and conditions of

storage.I.17.5.3.I CONTROL OF SPECIAL PROCESSES*Describe the program established to ensure special processes, such as welding, heat treating, and nondestructive examination are properly controlled. Include a

description of the criteria used to classify a process as special, the controls for

performance of special processes by only properly trained and qualified

personnel, and the applicable controls for records and documentation, use of

procedures, drawings, instructions, checklists and adherence to applicable codes

and standards.I.17.5.3.J. INSPECTION

Provide a description of controls for an inspection program (source, in-process, final, receipt, maintenance, modification, inservice, and operations). Include in the description the following:*A description of inspection planning and details required for inspection plans.

  • A description of controls for hold points, documentation of inspection results, and action in response to nonconformances. *A description of controls for inspection records and the information required in inspection records.*A description of controls for independence of inspectors, activities requiring the use of qualified inspection personnel, management review, and use of

instructions, procedures and drawings to control inspections and their results.*A description of controls for inspection requirements and acceptance criteria.

  • A description of controls for inspection and test in light of modifications, repairs, and replacements performed subsequent to the final inspection.I.17.5.3.K. TEST CONTROL

Describe the test control program for demonstrat ing that items will perform satisfactorily in service, including:

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 17 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006*A description of controls establishing when tests are required and qualification requirements for test personnel.*A description of the different types of tests and test procedure structure and controls, including a description of test prerequisites, test conditions, acceptance

criteria, mandatory hold points, data gathering, and test equipment requirements.*A description of controls for documentation and evaluation of test results, including the kinds of information required to be documented in test records.I.17.5.3.L.CONTROL OF MEASURING AND TEST EQUIPMENT

Describe the measuring and test equipment control program for the calibration, maintenance, and use of measuring and test equipment, including: *A description of the types of equipment covered by the program and the controls for periodic or pre/post-use calibration of test equipment, including the criteria on

which calibration frequency is based.*A description of controls for use of test equipment, including identification and marking for control of calibration status to prevent use of faulty test equipment

and controls for traceability to calibration test data, secondary standards, and

applicable nationally recognized (National Institute of Standards and Technology)

standards.*A description of controls for handling and evaluation of test equipment found to be out of calibration and evaluation of the acceptability of SSCs on which the out-

of-calibration test equipment had been used.*A description of controls for calibration procedures including documentation of and checks for test equipment accuracy and tolerances. *A description of controls for calibration records, including the calibration status of measuring and test equipment. I.17.5.3.M. HANDLING, STORAGE, AND SHIPPING (NOT APPLICABLE TO DC APPLICANTS)

Provide a description of controls established for package marking and labeling, handling and storage of items to assure adequate identification, maintenance and preservation of items, including: *A description of controls for items requiring special environments or need for other special controls.*A description of requirements and controls for special protective measures.

  • A description of controls and requirements for development and use of special DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 18 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 procedures for cleaning, handling, storage, packaging, shipping, and receiving. I.17.5.3.N. INSPECTION, TEST, AND OPERATING STATUS (NOT APPLICABLE TO DC AND ESP APPLICANTS)

Provide a description of the controls for inspection, test, and operating status of items to preclude inadvertent bypassing of inspections and tests and to prevent inadvertent operation, including:*A description of controls for the application and removal of status indicators and labels for SSCs in the nuclear power plant, including procedures for authority to

apply and remove tags, markings, labels, and stamps.*A description of controls and procedures for independent verification of equipment status controls. *A description of controls, including procedures and record keeping requirements for installation, removal, independent verification, and status control of temporary

modifications. I.17.5.3.O.NONCONFORMING MATERIALS, PARTS, OR COMPONENTS

Provide a description of the controls for nonconforming materials, parts, or components to prevent their inadvertent test, installation, or use, including:*A description of the controls established to review nonconforming items and disposition them as accepted, rejected, repaired, or reworked, including control of

the process by documented procedures, disposition approval by authorized

personnel, and documentation of the disposition with appropriate technical

justification(s).*A description of the controls that ensure the design control measures applied to the original design are also applied to design nonconformances that are

dispositioned "use-as-is" or "repair,"including the controls for updating applicable

records and as-built documentation.I.17.5.3.P. CORRECTIVE ACTION

Provide a description of the controls for the corrective action (problem identification and resolution) process, including:*A description of specific responsibilities for executing the program, including the defined responsibilities of performance and verification personnel and the

applicant/holder's retention of overall responsibility for program effectiveness, even when particular responsibilities are delegated.*A description of the measures in place to foster/encourage timely and accurate identification of all conditions adverse to quality, including the failure to follow DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 19 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 procedures, without fear of negative reaction.*A description of controls for ensuring conditions adverse to quality are promptly identified, documented, classified, analyzed for cause, corrected and followed up.*A description of controls for ensuring root causes of significant conditions adverse to quality are determined and eliminated to prevent recurrence, and for

ensuring subsequent corrective actions do not nullify prior corrective and

preventive actions. *A description of measures to identify, analyze, and report to appropriate levels of management any adverse trends and signifi cant conditions adverse to quality.*A description of the controls to assure appropriate response to nonconforming parts issues, design, and design process issues requiring significant design

changes.*A description of the controls to ensure competency, knowledge, and access to pertinent information of personnel involved in the corrective action process, including and especially those assigned to evaluate and determine corrective

action/disposition of nonconformances. I.17.5.3.Q.RECORDS

Provide a description of a records program that ensures adequate documentation of completed work by requiring storage of appropriate records of items and activities, including:*A description of the procedures, instructions, and other documentation that define, implement, and enforce the records system(s).*A description of the controls for generation, distribution, use, maintenance, storage and disposition of electronic media. Include a description of the means

used to ensure the records are defect free and the implementation of Generic

Letter 88-18, "Plant Record Storage on Optical Disks."*A description of the controls for the administration, receipt, storage, preservation, transmittal, location, maintenance, distribution, safekeeping, retrieval, and

disposition of records, including measures to ensure electronic records are

retrievable in human-readable format and are secure and protected, and

measures to ensure records are examined for adequacy, legibility, and completeness.*A description of the required content and controls for design documentation and records, and inspection and test records.*A description of the training provided to individuals or organizations in charge of electronic records generation, data/media storage, implementation of security

measures, migration/regeneration, and recovery.

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 20 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006*A description of the controls to assure that design specifications, test and operational procedures, procurement and other documents specify the records

generated, supplied, or maintained.*A description of the measures taken to identify/certify documents as valid records, classify and appropriately handle records, including electronic records, as lifetime or nonpermanent, and to assure indexing system(s) provide sufficient information to permit identification between the record and the item(s) or

activity(ies) to which they apply. *A description of the controls and retention periods imposed for programmatic and for product nonpermanent records.*A description of the controls for implementation of electronic record migration/regeneration for electronic records which have standard life

expectancies that cannot meet the required retention period. *A description of the cleanliness, environmental condition, and other storage controls implemented for electronic records.*A description of the personnel responsibilities, requirements, and other controls implemented for correction of records, including electronic records. *A description of the personnel responsibilities, requirements, and other controls for implementation of a records receipt control system that assures records are

protected and inventoried, and for electronic records, assures an inventory of

system applications, record formats, and programs required to process and

retrieve electronic records is maintained.*A description of the controls for training and qualification records.

  • A description of the records system audit/inspection process, including the process requirements to ensure electronic records retrievability, integrity, and

retention period. I.17.5.3.R. AUDITS

Provide a description of the responsibilities, procedural requirements, and other controls implementing the audit system, including:*A description of measures taken to assure personnel responsible for carrying out the audit function, including safety committee activities, audits, and other

independent assessments, are cognizant of day-to-day activities so that they can

act in a management advisory function.*A description of the priorities, orientation, and results focus for organizations with responsibilities for independent audit and oversight.

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 21 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006*A description of the controls for use of procedures and qualified personnel in the conduct of the audit function, and the measures to assure access to appropriate

levels of management to achieve res ponsive corrective and preventive action.*A description of the outside/offsite audit of the individual or organization responsible for verifying QA program implementation activities (not applicable to

DC applicants).*A description of the system of planned and periodic audits, including a discussion of frequency and schedule that assures all elements of an organization's QA

program are audited within a 2-year period. Include a description of the minimum

scope and focus of audits to assure assessment of the compliance and

effectiveness of audited elements of the organization's QA program and of

program functions/activities delegated to others, and to demonstrate that audits

provide a comprehensive, independent evaluation of activities and procedures.*A description of the organization's audit planning functions and contents of audit plans.*A description of QA organization and the audited organization responsibilities, required actions and process steps upon completion of an audit, including the

documentation, management review, response to and follow-up of audit results.*A description of the organization's system for procurement audits to assure the applicable requirements of 10 CFR Part 50, Appendix B, are applied to suppliers

of parts, services, software and other products falling under the program. Include

a description of exceptions to audit requirements, frequency of audits and

criteria/circumstances that would require additional audits, use of third party

audits, audit scope, audit report content and documentation requirements, and

the scope of documented periodic (annual) evaluations of suppliers.*A description of QA audit report content, signature, and issuance requirements, and associated process steps. *A description of the process for periodic records systems audits. I.17.5.3.S. TRAINING AND QUALIFICATION CRITERIA - QUALITY ASSURANCE

Provide a description of Quality Assurance (QA) training programs and qualification criteria for individuals holding responsibilities for execution and management of the QA program, including:*A description of the criteria, content, and scope of training programs to ensure that QA personnel achieve and maintain suitable proficiency.*A description of the education and qualification requirements for the individual assigned to manage the QA program.

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 22 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006*A description of the qualification requirements for individuals responsible for planning, implementing, and maintaining the QA plan, and for lead auditors.*A description of the requirements, minimum content, and approval of qualification records, and the process for establishing and maintaining the system of records

of personnel qualifications for auditors and lead auditors performing audits.I.17.5.3.T. TRAINING AND QUALIFICATION - INSPECTION AND TEST

Provide a description of the system of requi rements, process, and documented procedures for qualification, performance review, and qualification re-evaluation of personnel who perform

inspection and test activities, including:*A description of the education and experience requirements for qualification of Level I, II, and III test and inspection personnel.*A description of requirements for direct observation and supervision of persons in on-the-job training for qualification as an inspection and test person.I.17.5.3.U.QA PROGRAM COMMITMENTS

Provide a documented list and description of QA program commitments, including the list of regulatory guides and standards, and their appropriate revision, to which the applicant/holder is

committed, consistent with the requirements of SRP Section 17.5.

Note any exceptions or alternatives to the s pecific criteria in any of these RGs being proposed, and provide adequate justification for these exceptions or alternatives. I.17.5.3.V.10 CFR PART 21 AND 10 CFR 50.55(e) PROGRAMS NOTE: DC, COL, and ESP applicants are subject to the requirements of 10 CFR Part 21, which address the reporting of defects and noncompliances. Prior to fuel

load authorization, COL applicants and holders are subject to the requirements of

10 CFR 50.55(e). However, once the Commission has authorized the loading of

fuel, COL holders are subject to the requirements of 10 CFR Part 21.

Provide a description of the program for implem enting the requirements of 10 CFR Part 21 AND 10 CFR 50.55(e), including identification, documentation and preliminary evaluation of all non-

conforming conditions for "discovery" as defined in 21.3, i.e., to determine whether they should

be evaluated under 21.21(a)(1). *Specifically, describe how the program or process for identification of non-conforming materials, parts or components, under Criterion XV of Appendix B to

10 CFR Part 50, or conditions or significant conditions adverse to quality under Criterion XVI, ensures that nonconformances or conditions are screened for

evaluation under Part 21 or 50.55(e), as applicable. *Describe how the screening process for discovery prior to 21.21(a)(1) evaluation considers:

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 23 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006(1) whether they involve anything that is a basic component in the facility or anything that is to be delivered or offered for use at an NRC-licensed

facility as a basic component, (2) whether the nonconformance constitutes a deviation or failure to comply (with the potential for creating a substantial safety hazard), and (3) whether any affected goods or services are installed and/or in use and/or have been delivered or offered for use, such that if not, the problem could

be corrected before their being delivered or offered for use.

Provide descriptions of the following specific aspects of the Part 21 program: *A description of how the applicant/holder assures compliance with posting requirements of 10 CFR Part 21 relative to the reporting of defects and non-

compliances.*A description of the requirements and documented process for inclusion of 10 CFR Part 21 requirements in procurement documents for basic components.*A description of the requirements and documented process for meeting the 10 CFR PART 21 requirements for notification for failures to comply or existence of

a defect and its evaluation, including the generation of a written report per

10 CFR 21.21(d)(4), and a description of the criteria used in the evaluation of

failures to comply and/or existence of defects in accordance with the regulation.*A description of the measures to ensure that records necessary to document the applicant's compliance with 10 CFR Part 21 are prepared, maintained, and made

available for inspection. I.17.5.3.W.COMMERCIAL-GRADE DEDICATION (NOT APPLICABLE TO ESP AND DC APPLICANTS)

Provide a description of the commercial-grade dedication program in sufficient detail to demonstrate how it meets the requirements of 10 CFR Part 21 and the applicable requirements of Criteria I though XVIII of Appendix B, "Quality Assurance Criteria for Nuclear Power Plants

and Fuel Reprocessing Plants," to 10 CFR Part 50, "Domestic Licensing of Production and

Utilization Facilities."

Refer to draft SRP Section 17.5.W for more specific detail on the applicable items within each criterion that must be described as a minimum.I.17.5.3.X.DIGITAL EQUIPMENT SOFTWARE VERIFICATION AND VALIDATION QUALITY CONTROLS Provide a description of the controls and measures used to assure the QA program addresses quality controls for digital equipment software (software-based devices) used in safety-related systems, including:*A description of the measures to ensure digital equipment meets the DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 24 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 requirements of 10 CFR Part 50 Appendix B, including a description of measures within the following areas taken to ensure appropriate quality controls for digital

equipment software are established and implemented:*Organization, including management responsibilities and training and qualification requirements for personnel involved in digital equipment software

activities*QA Program, including procedures for quality controls, supplier quality assurance programs, and verification and validation requirements*Design Control, including program requirements for (as well as evaluation of vendor programs for) software/hardware configuration control, documented

procedures, failure analyses, verification, validation, and testing activities during

the software development life cycles, and operating history data. *Procurement document control and commercial-grade dedication

  • Test Control
  • Corrective Action
  • Audits
  • A description of the standards to which the applicant/holder is committed and ensures appropriate suppliers are committed, for digital equipment software

verification and validation quality controls, including:

a. Institute of Electrical and Electronics Engineers (IEEE) Std 1012-1998, "IEEE Standard for Software Verification and Validation," endorsed by RG 1.168.
b. Electric Power Research Institute (EPRI) NP-5652, "Guideline for the Utilization of Commercial-Grade Items in Nuclear Safety Related Applications (NCIG-07)," as conditionally endorsed by Generic Letter (GL) 89-02, "Actions to

Improve the Detection of Counterfeit and Fraudulently Marked Products," and

with the NRC staff positions promulgated in GL 91-05, "Licensee Procurement

and Dedication Programs," for the procurement of commercial-grade services

related to digital equipment.I.17.5.3.Y.NONSAFETY-RELATED SSC QUALITY CONTROLS (NOT APPLICABLE TO ESP APPLICANTS)

Design Certification Applicant:

Provide a description of any specific measures and controls established within each of the 18 criteria of 10 CFR Part 50, Appendix B, appropriate to risk significant, nonsafety related

structures, systems, and components (SSCs).

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 25 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 Considering the guidance available in draft SRP Section 17.5.Y., describe and provide justification for any exceptions or alternatives to the specific criteria in draft SRP Section 17.5.Y.

COL Applicant or COL Holder:

NOTE: The COL applicant or holder need only address aspects of the program not addressed by the DCD applicant).

Describe how the QAPD addresses the documents listed below for risk significant nonsafety related SSCs. Provide a description of and justification for exceptions or alternatives to the

specific criteria in any of these documents, with the exception of requirements that are in the design control document (DCD), which would require Commission approval of an exemption:*The quality requirements for the fire protection system in accordance with Regulatory Position 1.7, "Quality Assurance," in RG 1.189, "Fire Protection for

Operating Nuclear Power Plants."*The quality requirements for anticipated transient without scram (ATWS) equipment in accordance with Generic Letter 85-06, "Quality Assurance

Guidance for ATWS Equipment That Is Not Safety Related."*The quality requirements for station blackout (SBO) equipment in accordance with Regulatory Position 3.5, "Quality Assurance and Specific Guidance for SBO

Equipment That Is Not Safety Related," and Appendix A, "Quality Assurance

Guidance for Non-Safety Systems and Equipment," in RG 1.155, "Station

Blackout."

Describe how the QA requirements for nonsafety related SSCs in the DCD for the design and construction phase, are specified in the QAPD for the operational phase.

Describe how the QAPD addresses cause determinations and corrective actions for design and operational errors that degrade nonsafety-related, risk-significant SSCs.I.17.5.3.Z.INDEPENDENT REVIEW

This section is applicable to holders of a COL (operational phase).

Provide a description of the program, proce ss, membership and qualification requirements, management review and approval, and other requirements, including the scope and required

content of independent reviews, using either the Independent Review Body or Independent

Review Committee approaches.

Include in the description of the scope of independent reviews a description of the specific types of reviews, such as propose changes, tests, and experiments, proposed technical specification

changes and license amendments, violations, deviations and reportable events, nuclear safety

matters, corrective actions for significant conditions adverse to quality, and results of all assessments.

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 26 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006I.17.6DESCRIPTION OF APPLICANT'S PROGRAM FOR IMPLEMENTATION 10 CFR 50.65, THE MAINTENANCE RULE 1.0 Describe program procedures for Maintenance Rule implementation in accordance with NUMARC 93-01 as endorsed by Regulatory Guide 1.160, including, but not limited to the

following areas:

Note 1: Deviations from the guidance in NUMARC 93-01 and RG 1.160 should be explained and justified Note 2: While the Maintenance Rule does not require procedures or documentation, the NRC needs this information to obtain reasonable assurance of consistent compliance.1.1Scoping per 10 CFR 50.65(b): List and provide information on the structures, systems, or components (SSCs) within the scope of your proposed Maintenance Rule (MR)

program in the format of a full-relational database using the template provided by the

NRC. For each SSC in scope, provide the following as database fields:1.1.1Specific MR requirement(s) in 50.65(b) that require it to be in scope. Provide a data field for each subparagraph, i.e., (b)(1)(i), (b)(1)(ii), (b)(1)(iii), (b)(2)(i), (b)(2)(ii), (b)(2)(iii)1.1.2For each SSC record, indicate in each paragraph (b) field the function(s) that require the SSC to be in scope1.1.3For each SSC record, indicate in each paragraph (b) field, as applicable, the failure modes and effects that required the SSC to be in scope1.1.4For each SSC scoping function or vulnerability, indicate the functional performance requirements/success criteria and/or functional failure definitions and implications.1.1.5Identify each SSC explicitly mentioned in the EOPs (including those mentioned in referenced procedures) that is not in the MR scope. Describe the basis for its exclusion

from scope including the basis for its inclusion in the EOPs, the portion of any and all

mitigating functions provided, the expectation of reliability in this(ese) application(s), and

the means by which operators are alerted (e.g., procedural warnings, cautions, disclaimers, signs, etc.) to reduced assurance or expectation of reliability.1.2For each SSC, indicate its reactor safety significance classification (i.e., HSS or LSS) and the basis thereof, including risk metrics and values, IOE, vendor information, and

any other factors considered by the expert panel.1.3Procedures: Identify and describe the program procedures and documents (including computer software and data) that prescribe or govern scoping, including the items

above. Include status in procedural hierarchy, whether treated as safety-related or non-

safety-related, level of compliance expected, responsibility for preparation, review, approval, use, compliance oversight, and disposition.2.0Monitoring per 10 CFR 50.65(a):

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 27 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 For each SSC, indicate its standby or continuously operating status and associated type (i.e., availability, reliability, or condition) and leve l (i.e., component, system, pseudo-system, train, or plant) of monitoring/tracking.2.0.1Identify SSCs or equipment (e.g., circuit breakers, motorized valve actuators, etc.)

monitored/tracked at the component level or in special component classes or "pseudo

systems" that may involve applications in multiple systems and the bases thereof (e.g.

IOE, common failure modes, etc). Explai n how the program identifies and treats such SSCs.2.1Indicate which SSCs', if any, performance or condition will be monitored initially per paragraph 50.65(a)(1)2.1.1For each SSC to be in (a)(1) status, describe the performance monitoring (availability and reliability) or condition monitoring goals and the basis thereof. Discuss the extent to

which the goals are commensurate with safety and what IOE was taken into account.2.1.2Corrective Action: Provide procedures which require prompt, comprehensive and thorough corrective action that addresses the proximate and ultimate causes of

degraded performance or condition, that encompasses the extent of condition, and that

institutes preventive measures including changes that may be required in maintenance

and/or maintenance support practices, procedures and training.2.1.3Although not currently required by the MR, describe the extent to which any (a)(1) goals may be commensurate with radiation safety or offsite release control requirements (non-

DBE), i.e., to what extent and how they might be able to adequately monitor the

performance or condition of the SSC with respect to any collateral radioactivity control

function(s), whether active or passive, that the SSC might have.2.1.4Procedures: Identify and describe the program procedures and documents (including computer software and data) that prescribe or govern monitoring under (a)(1), including

the items above. Describe how the procedures address disposition of SSCs that do not

meet goals, including administration of corrective action. Include status in procedural

hierarchy, whether treated as safety-related or non-safety-related, level of compliance

expected, responsibility for preparation, review, approval, use, compliance oversight, and disposition.2.1.5Policies: Describe any plant management po licies, procedures or practices that involve the (a)(1) status of MR SSCs, e.g., for MR staff performance evaluation, etc.2.2Identify which SSCs will be tracked to demonstrate effective control of their performance or condition under 50.65(a)(2).2.2.1For each SSC to be in (a)(2) status, describe its performance (availability and/or reliability) criteria or condition monitoring criteria and the bases thereof. Discuss the

extent to which they are consistent with industry guidance (as endorsed by NRC),

commensurate with safety (including PRA insights) and good engineering practice, reasonable and sensible, etc., i.e., achievable and sufficiently sensitive to degraded DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 28 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 performance or condition) such that meeting them could adequately demonstrate effective control of the performance of the SSC through appropriate preventive

maintenance and such that the SSC would remain capable of performing its function(s)

and not fail in a manner adverse to safety. Deviations from industry guidance should be

explained.

2.2.1.1 For each reliability performance criterion, describe how the program defines and determines/identifies and treats functional failures, MR functional failures (MRFFs),

maintenance-preventable functional failures (MPFFs), and repetitive MPFFs.

2.2.1.2 For each availability performance criterion, describe how the program defines and tracks availability or unavailability (planned and unplanned), including exceptions and

credits and the basis thereof.

2.2.1.3 For each condition monitoring criterion, describe how the program addresses sensing, surveillance, tracking & trending, action levels (predictive maintenance), etc.

2.2.1.3 For each SSC categorized in a "run-to-failure" status, if any, describe the bases and treatment for this categorization, including (a) SSC function(s) and success/failure

criteria, (b) ability to detect degradation in performance or condition prior to failure, (c)

ability to predict failure based on IOE (e.g., average failure rates, application

vulnerabilities, MTBFs, etc.) and vendor information, (d) consequences of failure (modes, effects, safety significance), both with and without prompt detection and

correction/repair or replacement, (e) ability promptly to detect failure (e.g., self

revealing?), (f) means to ensure prompt identification and resolution, (g) procedures for

identification and disposition of excessive failure rates (including vendor interaction).2.2.2Performance criteria or condition monitoring criteria under (a)(2), although not currently required by the MR, may be evaluated to determine the extent to which they could also

be reasonably expected to demonstrate effective control of any collateral radioactivity

control function(s), whether active or passive, that the SSC might have.2.2.3Procedures: Identify and describe the program procedures and documents (including computer software and data) that prescribe or govern tracking under (a)(2), including the

items above. Describe how procedures govern disposition of SSCs for which effective control of performance or condition is not demonstrated (including not meeting

performance criteria or condition monitoring criteria). Address conditions under which

the expert panel may justify not placing an SSC in (a)(1) status. Include status in

procedural hierarchy, whether treated as safety-related or non-safety-related, level of

compliance expected, responsibility for preparation, review, approval, use, compliance

oversight, and disposition.

3.0 Periodic Evaluation per 10 CFR 50.65(a)(3):

Identify and describe the program procedures and documents (including computer software and data) that prescribe or govern periodic evaluation of the Maintenance Rule program in

accordance with 50.65(a)(3).

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 29 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/20063.1Describe how procedures govern the scheduling and timely performance of (a)(3) evaluations3.2Documenting, reviewing and approving eval uations, providing and implementing results3.3Making adjustments to achieve or restore balance between reliability and availability 3.4Industry operating experience (IOE) 3.4.1 Obtaining IOE Information, including information from NRC, INPO, EPRI and EPRI-sponsored organizations (e.g., the MRUG, CRMF, CBUGs, etc.), NSSS owners groups, other owners and users groups, and vendors (e.g., the VETIP, or other programs

established pursuant to NRC GL 83-28, Section 2.2)3.4.2 Processing IOE Information, including admin controls, routing/distribution, applicability screening and engineering/technical staff involvement3.4.3 Implementing/using IOE Information, including corrective action, maintenance, testing and inspection changes, modifications, improv ements, procedures, practices, training, qualification and IOE feedback to the processes for safety significance classification, monitoring or tracking type and level determination, goal setting and

performance/condition criteria development, procurement engineering (e.g., receipt

criteria, commercial-grade dedication), and material handling, storage, issue 4.0 Risk Assessment and Management per 10 CFR 50.65(a)(4):

Identify and describe the program procedures and documents (including computer software and data) that prescribe or govern maintenanc e risk assessment and management accordance with 50.65(a)(4) including, but not limited to the following areas: 4.1Determination of the scope (or limited scope) of SSCs to be included in (a)(4) riskassessments4.2Risk assessment and management during work planning 4.3Risk assessment and management of emergent conditions and updating risk assessments as maintenance situations and plant conditions and configurations are

changed.4.4Assessment (quantitative and qualitativ e capabilities) and management of risk of external events or conditions, including fire (internal, external and fire-risk-sensitive

maintenance activities), severe weather, ex ternal flooding, landslides, seismic activity and other natural phenomena; grid/offsite power reliability for grid-risk-sensitive

maintenance activities (respond to or refer to responses to MR-related questions in NRC GL 2006-02), and internal flooding.4.5 Assessment and management of risk of maintenance activities affecting containment DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 30 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 integrity.4.6Assessment and management of risk of maintenance activities when at low power or when shut down (including implementation of NUMARC 91-06).4.7Assessment and management of risk associated with the installation of plant modifications and assessment and management of risk associated with temporary

modifications in support of maintenance activities (in lieu of screening in accordance

with 10 CFR 50.59), in accordance with latest revision of NEI 96-07 as endorsed by

latest revision of RG 1.187.4.8 Risk assessment and management associated with risk-informed technical specifications.5.0Maintenance Rule Training and Qualification:

Describe the program, including procedures and documentation, for Maintenance Rule training

and qualification of the following personnel: (Note: While the Maintenance Rule does not require training and qualification, the NRC needs this information to obtain reasonable assurance of consistent compliance.)5.1Selection, Training and Qualification of Maintenance Rule Personnel5.1.1The Maintenance Rule Coordinator 5.1.2The Maintenance Rule Expert Panel5.2Training and Qualification of Engineering Personnel5.2.1System/Component Engineers 5.2.2Procurement Engineers 5.2.3Maintenance Engineers 5.2.4Probabilistic Risk Analysts/Safety Assessors 5.3Training and Qualification of Maintenance Personnel5.3.1Work Planners 5.3.2Maintenance Foremen and Shop Supervisors 5.3.3Technicians and Craftsmen5.4Training and Qualification of Operations Personnel5.4.1Shift Supervisors 5.4.2Shift Technical Advisors 5.4.3Senior Reactor Operators 5.4.4Reactor Operators 5.4.5Plant Operators5.5Training and Qualification of Licensing Personnel 5.6Basic Indoctrination of New Personnel 5.7Management Training 6.0 Maintenance Rule Program and Operational Reliability Assurance Program Interface:

Describe the relationship and interface between MR and ORAP (See Section C.I.17.4), including how functions are coordinated and procedures overlap and/or are cross referenced.

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 31 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 7.0 Maintenance Rule Program Implementation:

Describe the plan or process for implementing the MR program as described in the COL application, including sequence and milestones for establishing program elements, commencing

monitoring or tracking of performance and/or condition of SSCs as they become operational.

DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 32 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006I.17.7LIST OF REFERENCES*10 CFR Part 21*10 CFR Part 50*10 CFR 50.4

  • 10 CFR 50.34(a)(7)
  • 10 CFR 50.34(b)(6)(ii)
  • 10 CFR 50.34(f)(3)(ii)
  • 10 CFR 50.34(f)(3)(iii)
  • 10 CFR 50.34(g)
  • 10 CFR 50.54(a)
  • 10 CFR 50.55(e)(4)
  • 10 CFR 50.55(f)
  • 10 CFR 50.55a(b)(1)(iv)
  • 10 CFR 50.55a(b)(2)(x)
  • 10 CFR 50.55a(b)(3)(I)
  • 10 CFR 50.65
  • 10 CFR Part 50, Appendix B*10 CFR Part 52*10 CFR 52.47(a)(1) [cross references to other regulatory requirements]
  • 10 CFR 52.79 [cross references to other regulatory requirements]
  • 10 CFR 52.81 [cross references to other regulatory requirements]
  • 10 CFR 52.83 [cross references to other regulatory requirements]

Regulatory Guidance Documents*NUREG-0800, "Standard Review Plan"

  • RS-002, "Processing Applications for Early Site Permits," May 2004
  • RIS00-018 "Guidance on Managing Quality Assurance Records in Electronic Media"*RG 1.189, "Fire Protection for Operating Nuclear Power Plants"
  • RG 1.155, "Station Blackout"
  • RG 1.26, "Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants"*RG 1.29, "Seismic Design Classification"
  • RG 1.54, "Service Level I, II, and III Protective Coatings Applied to Nuclear Power Plants"*RG 1.97, "Instrumentation for Light-Water Nuclear Power Plants to Assess Plant and Environs Conditions During and Following an Accident"*RG 1.142 Revision 2, "Safety-Related Concrete Structures for Nuclear Power Plants (Other Than Reactor Vessels and Containments)" (11/01)*RG 1.143, "Design Guidance for Radioactive Waste Management Systems, Structures, and Components Installed in Light-Water-Cooled Nuclear Power

Plants"*RG 1.152, "Criteria for Digital Computers in Safety Systems of Nuclear Power Plants"*RG 1.160, "Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," Revision 2, March 1997 DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 33 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006*RG 1.168, "Verification, Validation, Reviews, and Audits for Digital Computer Software Uses in Safety Systems of Nuclear Power Plants"*RG 1.169, "Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"*RG 1.170, "Software Test Documentation for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"*RG 1.171, "Software Unit Testing for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"*RG 1.172, "Software Requirements Specifications for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"*RG 1.173, "Developing Software Live Cycle Processes for Digital Computer Software Used in Safety Systems of Nuclear Power Plants"*RG 1.182, "Assessing and Managing Risk Before Maintenance Activities at Nuclear Power Plants," May 2000*RG 1.200, "An Approach for Determining the Technical Adequacy of ProbabilisticRisk Assessment Results for Risk-Informed Activities"*RG 4.15, "Quality Assurance for Radiological Monitoring Programs (Normal Operations) - Effluent Streams and the Environment"*RG 7.10, "Establishing Quality Assurance Programs for Packaging Used in Transport of Radioactive Material"*NUMARC 93-01, "Industry Guidance for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants," Revision 2, dated April 1996*February 22, 2000, revision to Section 11 of NUMARC 93-01, "Assessment of Risk Resulting from Performance of Maintenance Activities."*NUREG 1070, "NRC Policy on Future Reactor Designs," July 1985

  • NUREG 1462, "Final Safety Evaluation Report Related to the Certification of the System 80+ Design," August 1994*NUREG 1503, "Final Safety Evaluation Report Related to the Certification of the Advanced Boiling Water Reactor Design," July 1994*NUREG 1512, "Final Safety Evaluation Report Related to the Certification of the AP600 Standard Design," September 1998*NUREG 1793, "Final Safety Evaluation Report Related to the Certification of the AP1000 Standard Design," September 2004*NUREG/CR 3385, "Measures of Risk Importance and Their Applications," May 1986 Generic Letters:*Generic Letter 83-28, "Required Actions Based on Generic Implications of Salem ATWS Events," July 8, 1983*Generic Letter 85-06, "Quality Assurance Guidance for ATWS Equipment That Is Not Safety Related," January 16, 1985*Generic Letter 89-02, "Actions to Improve the Detection of Counterfeit and Fraudulently Marketed Products," March 21, 1989*Generic Letter 91-05, "Licensee Commercial-Grade Procurement and Dedication Programs," April 9, 1991*Generic Letter 2006-02, "Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power," February 1, 2006 DG-1145, Section C.I.17 - Quality Assurance and Reliability Assurance Pg 34 of 34 DRAFT WORK-IN-PROGRESS DATE: 05/05/2006 Commission Papers*SECY 89-013, "Design Requirements Related to the Evolutionary Advanced Light-Water Reactors (ALWR)," January 19, 1989*SECY 93-087, "Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light-Water Reactor Designs," April 2, 1993*SECY 94-084, "Policy and Technical Issues Associated with Regulatory Treatment of Non-Safety Systems in Passive Plant Designs," March 28, 1994

and related Staff Requirements Memorandum, dated June 30, 1994*SECY 95-132, "Policy and Technical Issues Associated with Regulatory Treatment of Non-Safety Systems (RTNSS) in Passive Plant Designs," May 22, 1995