LR-N24-0071, Supplement to License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 21: | Line 21: | ||
==Subject:== | ==Subject:== | ||
Supplement to License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle References: | Supplement to License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle | ||
==References:== | |||
: 1. | : 1. | ||
PSEG letter to NRC, License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle, dated May 20, 2024 (ADAMS Accession No. ML24141A136) | PSEG letter to NRC, License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle, dated May 20, 2024 (ADAMS Accession No. ML24141A136) | ||
Latest revision as of 03:27, 21 February 2026
| ML24341A215 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 12/06/2024 |
| From: | Denight R Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N24-0071, LAR-H24-01 | |
| Download: ML24341A215 (1) | |
Text
Robert DeNight HCGS Site Vice President, PSEG Nuclear PO Box 236 Hancocks Bridge, New Jersey 08038-0221 856-339-5303 Robert.denightjr@pseg.com 10 CFR 50.90 LR-N24-0071 LAR H24-01 December 6, 2024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354
Subject:
Supplement to License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle
References:
- 1.
PSEG letter to NRC, License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle, dated May 20, 2024 (ADAMS Accession No. ML24141A136)
In the Reference 1 letter, PSEG Nuclear LLC (PSEG) submitted a license amendment request to Renewed Facility Operating License No. NPF-57 for Hope Creek Generating Station to implement a 24 Month Fuel Cycle. In this letter PSEG requested that once approved, the amendment shall be implemented during the Fall 2025 refueling outage.
Upon additional review of the scope of changes contained in the Reference 1 LAR, PSEG has determined that there are no actual activities requiring implementation during the Fall 2025 refueling outage. As a result of this review, PSEG is requesting that the implementation period be revised as follows:
Once approved, the amendment shall be implemented within 60 days.
PSEG has determined that the information provided in this submittal does not alter the conclusions reached in the 10 CFR 50.92 no significant hazards determination previously submitted. In addition, the information provided in this submittal does not affect the bases for concluding that neither an environmental impact statement nor an environmental assessment needs to be prepared in connection with the proposed amendment.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is needed, please contact Mr. Brian Thomas at brian.thomas@pseg.com.
LR-N24-0071 Page 2 I declare under penalty of perjury that the foregoing is true and correct.
Executed on 12-/4./i tf (Date)
/4~
Robert W. DeNight Site Vice President Hope Creek Generating Station cc:
Administrator, Region I, NRC NRC Project Manager, Hope Creek NRC Senior Resident Inspector, Hope Creek Manager, NJBNE 10 CFR 50.90 LAR H24-01