Information for "TXX-6165, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918. Field Verification Effort Complete & Engineering Evaluation in Progress.Next Rept Will Be Submitted by 870212"

Jump to navigation Jump to search

Basic information

Display titleTXX-6165, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918. Field Verification Effort Complete & Engineering Evaluation in Progress.Next Rept Will Be Submitted by 870212
Default sort keyTXX-6165, Interim Deficiency Rept CP-85-39 Re Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918. Field Verification Effort Complete & Engineering Evaluation in Progress.Next Rept Will Be Submitted by 870212
Page length (in bytes)4,833
Page ID1381649
Page content languageen - English
Page content modelwikitext
Indexing by robotsAllowed
Number of redirects to this page2
Counted as a content pageYes

Page protection

EditAllow all users (infinite)
MoveAllow all users (infinite)
View the protection log for this page.

Edit history

Page creatorStriderTol (talk | contribs)
Date of page creation14:21, 9 July 2023
Latest editorStriderTol (talk | contribs)
Date of latest edit14:21, 9 July 2023
Total number of edits1
Total number of distinct authors1
Recent number of edits (within past 90 days)0
Recent number of distinct authors0

Page properties

Transcluded templates (11)

Templates used on this page: