Information for "PNO-V-85-033, A:Channel C Reactor Trip Breaker Failed.Caused by Incorrect Measured Armature to Rivet Clearance & Trip Paddle Where Contacting Armature Plate Squared Off.Other Reactor Trip Breakers Reexamined"

Jump to navigation Jump to search

Basic information

Display titlePNO-V-85-033, A:Channel C Reactor Trip Breaker Failed.Caused by Incorrect Measured Armature to Rivet Clearance & Trip Paddle Where Contacting Armature Plate Squared Off.Other Reactor Trip Breakers Reexamined
Redirects toPNO-V-85-033, on 850605,Channel C Reactor Trip Breaker Failed to Open During Surveillance Testing of Undervoltage Trip Attachment.Preliminary Info Indicates That Failed Breaker Refurbished During Current Outage (info)
Default sort keyPNO-V-85-033, A:Channel C Reactor Trip Breaker Failed.Caused by Incorrect Measured Armature to Rivet Clearance & Trip Paddle Where Contacting Armature Plate Squared Off.Other Reactor Trip Breakers Reexamined
Page length (in bytes)4,652
Page ID950192
Page content languageen - English
Page content modelwikitext
Indexing by robotsAllowed
Number of redirects to this page0

Page protection

EditAllow all users (infinite)
MoveAllow all users (infinite)
View the protection log for this page.

Edit history

Page creatorStriderTol (talk | contribs)
Date of page creation00:03, 12 July 2020
Latest editorStriderTol (talk | contribs)
Date of latest edit22:23, 22 September 2022
Total number of edits3
Total number of distinct authors1
Recent number of edits (within past 90 days)0
Recent number of distinct authors0