Information for "PNO-III-86-041, on 860509,unit Shut Down to Repair Failed Main Steam Line Check Valve on Loop B.Normal Differential Pressure Exceeded by 37 Psig.Unit Expected to Be Shut Down for 48 H"
Jump to navigation
Jump to search
View the protection log for this page.
Basic information
Display title | PNO-III-86-041, on 860509,unit Shut Down to Repair Failed Main Steam Line Check Valve on Loop B.Normal Differential Pressure Exceeded by 37 Psig.Unit Expected to Be Shut Down for 48 H |
Default sort key | PNO-III-86-041, on 860509,unit Shut Down to Repair Failed Main Steam Line Check Valve on Loop B.Normal Differential Pressure Exceeded by 37 Psig.Unit Expected to Be Shut Down for 48 H |
Page length (in bytes) | 3,034 |
Page ID | 1033901 |
Page content language | en - English |
Page content model | wikitext |
Indexing by robots | Allowed |
Number of redirects to this page | 2 |
Counted as a content page | Yes |
Page protection
Edit | Allow all users (infinite) |
Move | Allow all users (infinite) |
Edit history
Page creator | StriderTol (talk | contribs) |
Date of page creation | 20:58, 23 November 2020 |
Latest editor | StriderTol (talk | contribs) |
Date of latest edit | 20:58, 23 November 2020 |
Total number of edits | 1 |
Total number of distinct authors | 1 |
Recent number of edits (within past 90 days) | 0 |
Recent number of distinct authors | 0 |
Page properties
Transcluded templates (13) | Templates used on this page:
|