Information for "PNO-II-93-063, on 931116,Unit 2 Shut Down Due to Concerns Re Potential Operability of Eight CCS Check Valves.Caused by Failure in Open Position of Seven & Eight Had Internal Piston Incorrectly Installed.Unit 2 Placed in Cold Shutdown"
Jump to navigation
Jump to search
View the protection log for this page.
Basic information
Display title | PNO-II-93-063, on 931116,Unit 2 Shut Down Due to Concerns Re Potential Operability of Eight CCS Check Valves.Caused by Failure in Open Position of Seven & Eight Had Internal Piston Incorrectly Installed.Unit 2 Placed in Cold Shutdown |
Default sort key | PNO-II-93-063, on 931116,Unit 2 Shut Down Due to Concerns Re Potential Operability of Eight CCS Check Valves.Caused by Failure in Open Position of Seven & Eight Had Internal Piston Incorrectly Installed.Unit 2 Placed in Cold Shutdown |
Page length (in bytes) | 5,435 |
Page ID | 1375210 |
Page content language | en - English |
Page content model | wikitext |
Indexing by robots | Allowed |
Number of redirects to this page | 2 |
Counted as a content page | Yes |
Page protection
Edit | Allow all users (infinite) |
Move | Allow all users (infinite) |
Edit history
Page creator | StriderTol (talk | contribs) |
Date of page creation | 13:34, 3 June 2023 |
Latest editor | StriderTol (talk | contribs) |
Date of latest edit | 13:34, 3 June 2023 |
Total number of edits | 1 |
Total number of distinct authors | 1 |
Recent number of edits (within past 90 days) | 0 |
Recent number of distinct authors | 0 |
Page properties
Transcluded templates (12) | Templates used on this page:
|