Information for "PNO-II-93-063, on 931116,Unit 2 Shut Down Due to Concerns Re Potential Operability of Eight CCS Check Valves.Caused by Failure in Open Position of Seven & Eight Had Internal Piston Incorrectly Installed.Unit 2 Placed in Cold Shutdown"

Jump to navigation Jump to search

Basic information

Display titlePNO-II-93-063, on 931116,Unit 2 Shut Down Due to Concerns Re Potential Operability of Eight CCS Check Valves.Caused by Failure in Open Position of Seven & Eight Had Internal Piston Incorrectly Installed.Unit 2 Placed in Cold Shutdown
Default sort keyPNO-II-93-063, on 931116,Unit 2 Shut Down Due to Concerns Re Potential Operability of Eight CCS Check Valves.Caused by Failure in Open Position of Seven & Eight Had Internal Piston Incorrectly Installed.Unit 2 Placed in Cold Shutdown
Page length (in bytes)5,435
Page ID1375210
Page content languageen - English
Page content modelwikitext
Indexing by robotsAllowed
Number of redirects to this page2
Counted as a content pageYes

Page protection

EditAllow all users (infinite)
MoveAllow all users (infinite)
View the protection log for this page.

Edit history

Page creatorStriderTol (talk | contribs)
Date of page creation13:34, 3 June 2023
Latest editorStriderTol (talk | contribs)
Date of latest edit13:34, 3 June 2023
Total number of edits1
Total number of distinct authors1
Recent number of edits (within past 90 days)0
Recent number of distinct authors0

Page properties

Transcluded templates (12)

Templates used on this page: