Information for "NL-15-053, Watts Bar, Units 1 and 2 - Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model"

Jump to navigation Jump to search

Basic information

Display titleNL-15-053, Watts Bar, Units 1 and 2 - Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model
Redirects toCNL-15-053, Watts Bar, Units 1 and 2 - Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model (info)
Default sort keyNL-15-053, Watts Bar, Units 1 and 2 - Combined 10 CFR 50.46 - 30-day and Annual Report of Changes and Errors to the Calculated Peak Cladding Temperature (PCT) for the Emergency Cooling Core System (ECCS) Evaluation Model
Page length (in bytes)696
Page ID238605
Page content languageen - English
Page content modelwikitext
Indexing by robotsAllowed
Number of redirects to this page1

Page protection

EditAllow all users (infinite)
MoveAllow all users (infinite)
View the protection log for this page.

Edit history

Page creatorStriderTol (talk | contribs)
Date of page creation08:13, 13 July 2018
Latest editorStriderTol (talk | contribs)
Date of latest edit20:44, 21 January 2019
Total number of edits3
Total number of distinct authors1
Recent number of edits (within past 90 days)0
Recent number of distinct authors0