TXX-6278, Interim Deficiency Rept CP-85-39 Re Equipment Conduit Not Installed in Accordance W/Design Documents.Initially Reported on 860918.Evaluation of Sample Results Adequacy to Entire Cable Population in Progress.Next Rept by 870515: Revision history
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.