RBG-35-397, Requests Permission to Operate Facility Addl 5000 Hours Until Fourth Refueling Outage W/O Reperforming Exam of N4A-2 Feedwater Nozzle to safe-end Weld & That NRC Amend Safety Evaluation Reflecting Info Contained in Encl Rept: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

25 September 2022