RBG-25814, Responds to NRC Re Violations Noted in Insp Rept 50-458/87-03.Corrective Actions:High Priority Given to Correcting Equipment Deficiencies That Made post-accident Sampling Sys (PASS) Inoperative.Addl PASS Training Planned: Revision history
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.