RA-20-0296, Letter from Sabrina Salazar (Duke Energy) to NRC Document Control Desk, Cycle 23 Core Operating Limits Report (Colr), Revision 2, Dated June 19, 2020: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 January 2022

17 January 2022

9 September 2021

8 September 2021

6 July 2021