PY-CEI-NRR-0750, Special Rept:On 871015,valid Failure on Div 2 Diesel Generator Occurred During Tech Spec Surveillance 4.8.1.1.2. Caused by Shuttle Valve Failing to Reposition on Start Signal.Valve Replaced & Design Change Initiated: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

19 July 2023