PNO-V-89-030, on 890518,airborne Process Monitors for Reactor Bldg Stack,Auxiliary Bldg Stack & Auxiliary Bldg Grade Level Vent Inoperable.Caused by Computer Controlled Svc Air Purge Valves in Open Position.Possibly Caused by Software Errors: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 February 2021