PNO-V-86-010, on 860312,reactor Brought Critical Following Negative Rate Trip During Net Load Startup Test on 860311. Reactor Declared in Commercial Operation on 860313: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

25 June 2020