PNO-V-85-033A, Channel C Reactor Trip Breaker Failed.Caused by Incorrect Measured Armature to Rivet Clearance & Trip Paddle Where Contacting Armature Plate Squared Off.Other Reactor Trip Breakers Reexamined: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

29 May 2023

22 September 2022

22 August 2022