PNO-IV-88-036, util Begun 2 to 3-wk Maint Outage.Startup Testing Completed on 30% Power Testing Plateau.Licensee Also Plans to Replace Corroded Aluminum Bronze Fittings & Valves in Essential Cooling Water Sys.State of Tx Informed: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

24 October 2020