PNO-IV-85-063, on 851206,reactor Inadvertently Tripped.Caused by Operator Incorrectly Initiating Steps of Surveillance Tests on Control Element Assembly Calculators.Cold Shutdown Planned to Replace Reactor Coolant Pump Seals: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

22 July 2020

29 June 2020