PNO-III-88-007, on 880206,300 Lbs of Calciner U3O8 Spilled Onto Concrete Pad as Result of Seal Leak from Calciner.Spill Occurred While Plant in Shutdown Mode for Weekend.Matl Cleaned Up within 45 Minutes of Discovery: Revision history
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.