PNO-III-85-063, on 850723,reactor Shut Down to Repair Thrust Bearing Housing on Feedwater Pump,Damaged During 850722 Demonstration Testing.Further Exam Underway: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

10 August 2022