PNO-II-96-083, on 961214,Unit 2 Shutdown Due to Small Amount of Backleakage Through Injection Sys Discharge Check Valve, Causing Gas Entrainment in B Train of RHR Sys.Nrc Resident Inspectors Observed Unit Shutdown & RHR Testing: Revision history
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.