PNO-II-94-001, on 940107,plant Began CPR from 100% Power to Mode 4 Due to Inoperable Ccp.Resident Inspector Dispatched. State of Tn Informed: Revision history
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.