PNO-II-93-063, on 931116,Unit 2 Shut Down Due to Concerns Re Potential Operability of Eight CCS Check Valves.Caused by Failure in Open Position of Seven & Eight Had Internal Piston Incorrectly Installed.Unit 2 Placed in Cold Shutdown: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

3 June 2023