PNO-I-89-079, on 890911,unplanned Reactor Shutdown for Greater than 48 H Due to Problems W/Emergency Diesel Generator.Drywell Entered,Leaking Feedwater Check Valve Repaired & Minor Maint Performed: Revision history
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.