PNO-I-89-060, facility Authorized to Proceed to 100% Power. Evaluation by NRC Determined to Be Satisfactory.Insp on Site Will Continue w/around-clock Coverage: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

11 February 2021