PNO-I-88-101, on 881005,MSIV C Closed Fully During Partial Stoke Testing of Valve,Causing Water Level Decrease in Steam Generator C & Reactor Trip on lo-lo Steam Generator Level. Shutdown Extended to Perform Maint on Valve: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

17 December 2020

14 November 2020