PNO-I-85-076, on 851009,reactor Shut Down After Unsuccessful Attempt to Identify Cause of 1.5 Gpm Leak from Reactor Coolant Pump 11A Controlled Bleed Off Line.Caused by Cracked Weld: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

4 July 2020