PNO-I-80-001, on 800104,isolation Condenser Isolated.Addl Insps of Containment Wall in Progress.Power Operation Will Continue Per Tech Specs for 15 Days.Precedures Require Power Be Reduced to 40% 24-h After Removing Condenser from Svc: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

12 July 2020