ND-18-0004, (VCSNS) Units 2 and 3, ITAAC Completion and Operational Program Implementation Schedule Updates (Required by 10 CFR 52.99(a) and License Conditions 2.D.(11) and 2.D.(12)(e)): Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

7 March 2020