L-77-386, Proposed Amendment to Facility Operating License No. DPR-67. Technical Specifications Proposed Change Concerning Modification of Incore Monitoring Alarm Setpoints & Excore Monitoring Power Scaling Factor to Be More Conservative: Revision history
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.