L-2002-009, Proposed License Amendments, Surveillance Requirement 4.8.1.1.2.g.7 Change to Perform the Emergency Diesel Generator 24-Hour Functional Testing During Power Operation: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

28 March 2020