BECO-87-153, Supplemental Application for Amend to License DPR-35, Revising Tech Spec Section 3.12.B.b to Requirement Orderly Shutdown Reactor If Backup Fire Water Supply Sys Not Established within 24 H of Suppression Sys Inoperability: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

26 July 2021