BECO-87-152, Submits Revised Table 3.7-1 of Util 870813 Proposed Tech Spec Change 87-11R.Changes Made to Correctly Identify RHR Discharge to Radwaste as Outside Primary Containment & List Correct Penetration for Reactor Vessel Head Spray Valves: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

26 July 2021