B15508, Application for Amend to License NPF-49 Re Existing SRs 4.8.1.1.2.a.6 & 4.8.1.1.2.b to Require That DG Be Loaded to Greater than or Equal to 4986 Kw for at Least Sixty Minutes During Routine Surveillance: Revision history
Jump to navigation
Jump to search
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.