A840071, Final Deficiency Rept Re Agastat Relay Bases Not Tightened to Metal Channels in Power Generation Control Complex Per GE Instructions.Initially Reported on 830811.All Bases Will Be Inspected & Replaced as Needed by 840601: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

26 September 2022