10 CFR 50.54(a)(3): Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

24 January 2024

  • curprev 14:4614:46, 24 January 2024StriderTol talk contribs 2,122 bytes +489 No edit summary
  • curprev 14:4114:41, 24 January 2024StriderTol talk contribs 1,633 bytes +1,633 Created page with "'''10 CFR 50.54(a)(3)''' is the requirement to submit changes made to Quality Assurance Report. == Excerpt == {{main|10 CFR 50.54}} (4) Changes to the quality assurance program description that do reduce the commitments must be submitted to the NRC and receive NRC approval prior to implementation, as follows: : (i) Changes made to the quality assurance program description as presented in the Safety Analysis Report or in a topical report must be submitted as specifie..."