05000255/LER-1983-006, Informs That Safety Injection & Refueling Water Tank Support Structure Insp Will Not Be Performed for Tank in Present Partially Loaded Configuration.Insp Will Not Be Performed Until Structure in Fully Loaded Condition,Per LER 8: Revision history

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

3 August 2020

25 July 2020

14 July 2020

23 May 2020

18 April 2020