Creating The proposed REP does not on site whenever the reactor (NTR) is operational or require an Emergency Director entries into EVESR, GETR, or VBWR are in progress. (previously titled EOC) to be on Otherwise, the Emergency Director may be offsite.

Jump to navigation Jump to search