Creating Determined that the status control of these valves was most likely lost during the post-modification testing performed in late April 2009. Upon discovery, the valves were promptly aligned to provide cooling flow and the performance issue was captured in
Jump to navigation
Jump to search
Select a form to create this page:
Main forms:
Other forms:
Agency · CCA matrix · Document-type · Intervenor · Isotope · Model · NOED · Quarter · SDP · Site · Vendor · Visit