Creating -7 was performed with the normal control room staff compliment of 3 senior reactor operators and 3 reactor operators. The team also noted the validation was not performed with a
Jump to navigation
Jump to search
Select a form to create this page:
Main forms:
Other forms:
Agency · CCA matrix · Document-type · Intervenor · Isotope · Model · NOED · Quarter · SDP · Site · Vendor · Visit