View source for PY-CEI-NRR-0750, Special Rept:On 871015,valid Failure on Div 2 Diesel Generator Occurred During Tech Spec Surveillance 4.8.1.1.2. Caused by Shuttle Valve Failing to Reposition on Start Signal.Valve Replaced & Design Change Initiated

Jump to navigation Jump to search

You do not have permission to edit this page, for the following reason:

The action you have requested is limited to users in the group: Users.


You can view and copy the source of this page.

Return to PY-CEI-NRR-0750, Special Rept:On 871015,valid Failure on Div 2 Diesel Generator Occurred During Tech Spec Surveillance 4.8.1.1.2. Caused by Shuttle Valve Failing to Reposition on Start Signal.Valve Replaced & Design Change Initiated.