View source for PNO-V-86-020, on 850418,Unit 2 Reactor Was Brought to Criticality Following Dilution of Rcs.Estimated Critical B Was 1015 Ppm W/Group 5 Control Rod Bank 75 Inches Withdrawn. Resident Inspector Witness Approach to Initial Criticality
Jump to navigation
Jump to search
You do not have permission to edit this page, for the following reason:
You can view and copy the source of this page.
Templates used on this page:
- Template:!! (view source)
- Template:Adams (view source)
- Template:Adams-type-Nav (view source)
- Template:Infobox (view source)
- Template:Infobox/row (view source)
- Template:Name (view source)
- Template:Navbar (view source)
- Template:Navbox (view source)
- Template:PNO-Nav (view source)
- Template:Transclude (view source)
- Module:Arguments (view source)
- Module:Navbar (view source)
- Module:Navbox (view source)