View source for PNO-V-86-020, on 850418,Unit 2 Reactor Was Brought to Criticality Following Dilution of Rcs.Estimated Critical B Was 1015 Ppm W/Group 5 Control Rod Bank 75 Inches Withdrawn. Resident Inspector Witness Approach to Initial Criticality

Jump to navigation Jump to search

You do not have permission to edit this page, for the following reason:

The action you have requested is limited to users in the group: Users.


You can view and copy the source of this page.

Return to PNO-V-86-020, on 850418,Unit 2 Reactor Was Brought to Criticality Following Dilution of Rcs.Estimated Critical B Was 1015 Ppm W/Group 5 Control Rod Bank 75 Inches Withdrawn. Resident Inspector Witness Approach to Initial Criticality.