View source for PNO-II-89-060A, on 890825,reactor Manually Tripped from 97% Power Due to Pressurizer a Safety Valve Lifting.Licensee Plans to Go to Cold Shutdown & Replace Valve.Repairs Expected to Take 1 Wk

Jump to navigation Jump to search

You do not have permission to edit this page, for the following reason:

The action you have requested is limited to users in the group: Users.


You can view and copy the source of this page.

Return to PNO-II-89-060A, on 890825,reactor Manually Tripped from 97% Power Due to Pressurizer a Safety Valve Lifting.Licensee Plans to Go to Cold Shutdown & Replace Valve.Repairs Expected to Take 1 Wk.