View source for PNO-II-89-060, A:on 890825,reactor Manually Tripped from 97% Power Due to Pressurizer a Safety Valve Lifting.Licensee Plans to Go to Cold Shutdown & Replace Valve.Repairs Expected to Take 1 Wk
Jump to navigation
Jump to search
You do not have permission to edit this page, for the following reason:
You can view and copy the source of this page.