View source for TXX-4762, Interim Deficiency Rept CP-86-07 Re Weld Failure & Coating Degradation in Svc Water Sys.Initially Reported on 860124. Connected Pipe Nipple Lengthened to Add Flexibility & Eliminate Stress Riser.Final Rept Expected by 860730

Jump to navigation Jump to search

You do not have permission to edit this page, for the following reason:

The action you have requested is limited to users in the group: Users.


You can view and copy the source of this page.

Return to TXX-4762, Interim Deficiency Rept CP-86-07 Re Weld Failure & Coating Degradation in Svc Water Sys.Initially Reported on 860124. Connected Pipe Nipple Lengthened to Add Flexibility & Eliminate Stress Riser.Final Rept Expected by 860730.