Search results

Jump to navigation Jump to search
Results 1 – 20 of 33,210
Advanced search

Search in namespaces:

  • valves or flow meters in the leak-off lines would provide an acceptable method of signaling small leakage from these valves. While the above-mentioned leakage
    18 KB (2,674 words) - 02:07, 17 January 2025
  • manner, we request that ) you proside us with the above mentioned information by 1/17/97. As mentioned, the information is an important part of our evaluation
    13 KB (2,032 words) - 08:36, 12 December 2024
  • 0.6 times model flow? (3) What is the flow from and to? E: ~ (Interos 2, Continued) nt@j (4) Is the NRC requiring a 0.6 times model flow, placing a greater
    20 KB (3,411 words) - 18:35, 19 December 2024
  • that the new ESW valve alignment will not reduce ESW flows to safety-related coolers below their flow balance acceptance criteria (with the failure of one
    30 KB (5,225 words) - 11:03, 6 January 2025
  • back in service with the exception of the small-bore Group 1 PCIS valves mentioned above. By 2/3/94, the relay coil was replaced and the Group 1 PCIS valves
    13 KB (2,122 words) - 21:36, 16 December 2024
  • RCJC Flow HPCI Flow Core Spray System Flow LPCJ System Flow SLCSFlow SLCS Sto~ge Tank Level Residual Heat Remon! {RBR) Systems RHR System Flow RHR Heat
    84 KB (13,252 words) - 02:06, 17 January 2025
  • about NRC requiring 0.6 times model flow? (3) What is the flow from and to? (4) Is the NRC requiring a 0.6 times model flow, placing a greater requirement than
    37 KB (6,107 words) - 09:17, 18 December 2024
  • Feedwater Flow Feedwater flow is continuously monitored and recorded on the 12" Feedwater flow circular chart FR-lD07 ecaled 0-1,000,000 lb/hr. Steam Flow Steam
    28 KB (4,593 words) - 04:04, 21 December 2024
  • unexpectedly. Reactor power was reduced to approximately 67 percent by reducing flow on the reactor recirculation system (Ells I Code AD). Concurrently, personnel
    45 KB (7,365 words) - 17:38, 6 December 2024
  • TS-354 OPRM changes into the three previously approved TS change packages mentioned above. Accordingly, in the Enclosure are the TS-354 typed TS and TS Bases
    5 KB (801 words) - 11:17, 6 January 2025
  • steady-state flow-only model (Prior to 1940); Steady-state flow and transient transport calibration model (1940 - 1968); Seasonal transient flow and transport
    109 KB (18,230 words) - 07:41, 25 November 2024
  • STN50-528/529/530 Submission of. El Paso Electric -Company Projected-1999 Cash-Flow Statement and Application for Withholding Information from Public Disclosure
    5 KB (752 words) - 17:13, 7 January 2025
  • 1. The 75% power steady state test showed point Cl27 (Tota'. Recire Flow to the Flow converters) to be out of tolerance in the 1998-1999 certification year
    18 KB (3,121 words) - 19:06, 7 December 2024
  • circuit logic interpreted no flow from CCW pump 1 discharge flow switch FS 1422D, even though actual flow existed, because the flow switch was isolated for
    54 KB (8,615 words) - 17:11, 10 December 2024
  • conditioned flow, threw an elbow in 16 front of it, looked at the profile factors, looked at the 17 meter factors, the effects are -- and with a flow 18 straightener
    175 KB (33,937 words) - 20:01, 10 December 2024
  • given a cool' reception by the Appeal Board it is also a specific matter mentioned in the final RDA report, NUREG/CR-4025 (in just this configuration: working'in
    27 KB (4,342 words) - 21:33, 1 December 2024
  • to the RCS will be, (1) a flow path from the refueling water storage tank (RUST) to a charging pump to the RCS and, (2) a flow path from the RWST to a low
    10 KB (1,666 words) - 01:25, 2 December 2024
  • screening process. In the first stage, the limiting assembly inlet flow factor (and the flow factors in the four adjacent assemblies to the limiting assembly)
    13 KB (2,039 words) - 07:09, 6 January 2025
  • other concerns flow from a concern that Holtec is unwilling to perform a rigorous decommissioning at Indian Point. The PSDAR does not mention the presence
    7 KB (995 words) - 21:17, 27 November 2024
  • Applicant prior to Quadrex detected the inappropriate use of RELAP3 code mentioned in Question N-13? (a) If so, make available any document sho~ wing:this
    18 KB (3,100 words) - 19:20, 19 December 2024
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)