PM-79-107, Forwards Monthly Operating Rept for Nov 1979
(Redirected from PM-79-107)
Jump to navigation
Jump to search
| ML19256F287 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/10/1979 |
| From: | Manry W GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19256F288 | List: |
| References | |
| PM-79-1074, NUDOCS 7912180438 | |
| Download: ML19256F287 (1) | |
Text
.
Georgia Power Company Post Othce Box 442 Baxley, Georgia 31513 Telephone 912367 7781 912 537 9444 n
Georgia Power Edwin 1. Hatch Nuclear Plant te southem eWirc system December 10, 1979 PM-79-1074 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-366 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Cocmission Washington, D.C.
20555
Dear Sirs:
Pursuant to Section 6.9.1.6 of the Hatch Unit 2 Technical Specifiestions, please find attached the NRC Monthly Operating Report.
m
~!T&WB~Y Plant ManageV [,
- l. Manry MM/pebo xc:
R. F. Rogers C. T. Moore T. V. Greene File 1608 273 L-7 outso