Requests Listed Marked Documents Re Rev 1 to NUREG-1147, Seismic Safety Research Program Plan, Be Placed in PDRML20214P812 |
Person / Time |
---|
Site: |
Perry |
---|
Issue date: |
05/27/1987 |
---|
From: |
Kenneally R NRC |
---|
To: |
Dunlavey M NRC |
---|
Shared Package |
---|
ML20213E796 |
List: |
---|
References |
---|
RTR-NUREG-0784, RTR-NUREG-1147, RTR-NUREG-1222, RTR-NUREG-1264, RTR-NUREG-784 NUDOCS 8706040041 |
Download: ML20214P812 (5) |
|
Similar Documents at Perry |
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20212C0761999-09-15015 September 1999 Notification of 990930 Meeting with Firstenergy Nuclear Operating Co in Rockville,Md to Discuss Licensee Recent Submittal Requesting Five Percent Power Uprate ML20212J3201999-06-23023 June 1999 Forwards Proposed Change to STSs for Review & Comment.Change Would Remove TS Requirements for ESF Features to Be Operable After Sufficient Radioactive Decay Has Occurred to Ensure Off Site Doses Remain Below SRP Limits DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205P6271999-04-14014 April 1999 Notification of 990428 Meeting with Util to Discuss Proposed Asset Transfer Between Duquesne Light Co & First Energy Nuclear Operating Co & Associated License Transfer of Beaver Valley Power Station Per 10CFR50.80 ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20198R8831999-01-0707 January 1999 Forwards SER Accepting Licensee 971015 Request to Amend Perry Nuclear Power Plant TSs 5.2.2.e to Remove Reference to GL 82-12 & Require Administrative Controls Be Established Which Will Ensure Adequate Shift Coverage ML20196D9451998-11-30030 November 1998 Notification of 981204 Meeting with Centerior Svc Co in Rockville,Md to Discuss Proposed Revs to Licensing Basis for Feedwater Containment Isolation Valves ML20195B8551998-11-0909 November 1998 Notification of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Revisions to Licensing Basis for Feedwater Containment Isolation Valves ML20238F8661998-09-0101 September 1998 Forwards Licensee Revs to Svc List for Placing in PDR ML20238F3341998-08-31031 August 1998 Notification of 980915 Meeting W/Centerior Service Co in Rockville,Md to Discuss Licensing Submittal Based Upon Revised Accident Source Term That Deletes MSIV Leakage Control Sys & Relaxes MSIV Leakage Limits ML20238F1861998-08-28028 August 1998 Notification of 980910 Meeting W/Centerior Service Co in Rockville,Md to Discuss Proposed Revs to Licensing Basis for Feedwater Containment Isolation Valves ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20248F4571998-06-0202 June 1998 Notification of 980625 Meeting W/Util in Rockville,Md to Discuss Analytical Testing Bases for Mark III ECCS Suction Strainer ML20216D8551998-04-14014 April 1998 Forwards Signed Original of Order Imposing Civil Monetary Penalty.Addl 5 Copies & Disk Encl,For Use.W/O Encl ML20217B8441998-03-0606 March 1998 Notification of Cancellation of 980331 Meeting in Rockville, MD to Discuss Proposed Testing Program for ECCS Suction Strainer ML20197B7831998-03-0606 March 1998 Notification of 980331 Meeting W/Ceic in Rockville,Md to Discuss Proposed Testing Program for ECCS Suction Strainer. (Proprietary Info Will Be Discussed) ML20199A3291997-11-13013 November 1997 Forwards NRC Operator Licensing Exam Rept 50-440/97-309OL on 970825-30 w/as-given Written Exam ML20199A3071997-11-13013 November 1997 Forwards NRC Operator Licensing Exam Rept (Included Completed & Graded Tests) for Tests Administered During Wk of 970825 ML20138D8451997-04-29029 April 1997 Notification of 970508 Meeting W/Clei in Rockville,Md to Discuss Priorities & Schedules of Licensing Issues for Plant ML20147J2271997-04-10010 April 1997 Forwards for Transmittal Notice of Proposed Merger for Perry Nuclear Power Plant,Unit 1 ML20136F9741997-03-13013 March 1997 Notification of 970324 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md to Discuss Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept & to Discuss Acoustic Methodology Applied to Upper Lift Load ML20135E4781997-03-0505 March 1997 Notification of 970306 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md to Review Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept.Meeting Cancelled ML20134Q1271997-02-25025 February 1997 Notification of 970306 Meeting W/Util in Rockville,Md to Review Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept & to Discuss Acoustic Methodology Applied to Upper Lift Load Reduction ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134P9011996-11-26026 November 1996 Notification of 961204 Meeting W/Clei & Teco in Rockville,Md to Discuss Potential Submittals Concerning Proposed Merger of Centerior Energy Co & Oec ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20149E8161994-08-0202 August 1994 Forwards Fr Notice of License Amend Requests Proposed Merger of Toledo Edison Co & Cleveland Electric Illumianting Co Antitrust Determination NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059E5031994-01-0606 January 1994 Forwards Results of on-site EQ Review of Related Info at Plant in Support of Staff Task Action to Identify & Address Existing EQ Issues & Concerns.Encl 1 Provides Results of Staff Review.Encl 2 Provides Draft Ltr to Transmit Info ML20058N4811993-12-15015 December 1993 Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately ML20058M0351993-12-13013 December 1993 Notification of 931214 Meeting W/Licensee in Rockville,Md to Discuss Plant Fuel Failure Root Cause Analysis ML20057G3001993-10-15015 October 1993 Notification of 931028 Meeting W/Util in Rockville,Md to Discuss Plant Course of Action Plan to Improve Performance of Plant Over Next Several Yrs ML20057D5251993-09-0101 September 1993 Forwards 2.206 Petition Submitted by Capella,Wene & O'Connell Re Poor Performance of Plant.W/O Encl ML20056G0181993-08-26026 August 1993 Notification of 930902 Meeting W/Util in Rockville,Md to Discuss Facility IST ML20056E7141993-08-19019 August 1993 Notification of 930831 Meeting w/BWR-6 Owners Group in Rockville,Md to Discuss Pending Amend Submittals to Adopt Improved Standardized TS ML20062C2851990-10-18018 October 1990 Forwards Stipulation of Agreed Facts Between Licensee,Nrc Staff & Ohio Citizens for Responsible Energy, Signed by Three Parties.Original Stipulation Returned to Silberg. W/O Encl ML20059M0271990-09-17017 September 1990 Forwards Amend to Facility License,Removing cycle-specific Parameters from Tech Specs.W/O Encl ML20059H2091990-09-0505 September 1990 Provides Recipients & Hiatt W/Util Proposed Amend to Delete Values of cycle-specific Parameters of Each Core from Tech Specs ML20056A3641990-07-24024 July 1990 Requests Addition of Listed Name to Svc List for Plant Proceeding.W/Certificate of Svc.Served on 900726 ML20248D1391989-09-25025 September 1989 Forwards AEOD/T915, Ground Fault Detection & Trip Circuit at Perry Unit 1, Technical Review Rept.No Further AEOD Action Recommended,Based on Merits of Alarm Scheme for Resolution of Issue ML20248B5631989-06-0606 June 1989 Forwards,For Info,Aeod Diagnostic Evaluation Team Rept for Plant.Evaluation Initiated Following Discussions Held During Senior Managers Meeting in Dec 1988 ML20247E5711989-05-22022 May 1989 Notification of 890531 Meeting W/Util in Rockville,Md to Discuss Monthly Performance Rept ML20246L2701989-05-0909 May 1989 Forwards SALP Inputs for SALP 9 Rept,Including Info Obtained During Exams Reported in Exam Repts 50-440/OL-88-01 & 50-440/OL-88-02.Deficiencies Noted Re Failure to Provide Training on Auxiliary & Emergency Sys ML20246A2771989-05-0303 May 1989 Forwards SALP Input for May 1988 - May 1989,in Accordance W/ 890401 Memo ML20236E3261989-03-20020 March 1989 Forwards Assessment & Tech Spec Clarification Re 881212 Loss of 5-volt Dc Power Supply & Loss of Rod Display & Operator Control Modules.Restoration of Normal Rod Position Indication,Rather than rod-by-rod Indication,Proper ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20206C6041988-11-0808 November 1988 Discusses Review of 870227 Significant Precursor Event Re Two Inoperable Diesel Generators,Per R Dudley 881013 Note. Util Corrective Actions Appear Thorough & Comprehensive ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20155J3931988-10-20020 October 1988 Notification of 881102 Meeting W/Util in Rockville,Md to Discuss Unit 1 Operating Performance.Proposed Agenda Encl 1999-09-15
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20212C0761999-09-15015 September 1999 Notification of 990930 Meeting with Firstenergy Nuclear Operating Co in Rockville,Md to Discuss Licensee Recent Submittal Requesting Five Percent Power Uprate ML20212J3201999-06-23023 June 1999 Forwards Proposed Change to STSs for Review & Comment.Change Would Remove TS Requirements for ESF Features to Be Operable After Sufficient Radioactive Decay Has Occurred to Ensure Off Site Doses Remain Below SRP Limits DD-99-05, Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action1999-04-20020 April 1999 Forwards Monthly Rept on Status of 10CFR2.206 Petition as of 990331.During March,Director'S Decision (DD-99-06) on Browns Ferry & DD on Army Corps of Engineers Was Issued & (DD-99-05) on Diablo Canyon Became Final Agency Action ML20205P6271999-04-14014 April 1999 Notification of 990428 Meeting with Util to Discuss Proposed Asset Transfer Between Duquesne Light Co & First Energy Nuclear Operating Co & Associated License Transfer of Beaver Valley Power Station Per 10CFR50.80 ML20205B8871999-03-26026 March 1999 Notification of 990415 Meeting with Utils in Knoxville,Tn to Visit Test Site & Discuss Test Program for ECCS Suppression Pool Suction Strainer.Context of Meeting Considered Entirely Proprietary ML20199L0511999-01-21021 January 1999 Notification of 990222 Meeting with Util in Rockville,Md for Ucs to Present Addl Info & Clarify Issues Raised in Two 10CFR2.206 Petitions Re River Bend Station & Perry Nuclear Power Plant ML20198R8831999-01-0707 January 1999 Forwards SER Accepting Licensee 971015 Request to Amend Perry Nuclear Power Plant TSs 5.2.2.e to Remove Reference to GL 82-12 & Require Administrative Controls Be Established Which Will Ensure Adequate Shift Coverage ML20196D9451998-11-30030 November 1998 Notification of 981204 Meeting with Centerior Svc Co in Rockville,Md to Discuss Proposed Revs to Licensing Basis for Feedwater Containment Isolation Valves ML20195B8551998-11-0909 November 1998 Notification of 981119 Meeting with Util in Rockville,Md to Discuss Proposed Revisions to Licensing Basis for Feedwater Containment Isolation Valves ML20238F8661998-09-0101 September 1998 Forwards Licensee Revs to Svc List for Placing in PDR ML20238F3341998-08-31031 August 1998 Notification of 980915 Meeting W/Centerior Service Co in Rockville,Md to Discuss Licensing Submittal Based Upon Revised Accident Source Term That Deletes MSIV Leakage Control Sys & Relaxes MSIV Leakage Limits ML20238F1861998-08-28028 August 1998 Notification of 980910 Meeting W/Centerior Service Co in Rockville,Md to Discuss Proposed Revs to Licensing Basis for Feedwater Containment Isolation Valves ML20238F5861998-08-28028 August 1998 Notification of 980909 Meeting w/BWR/6S:EOI & Listed Utils in Rockville,Md to Discuss W/Nrc Planned Applications by Licensees to Reduce Operability Requirements During Refueling Outages ML20248F4571998-06-0202 June 1998 Notification of 980625 Meeting W/Util in Rockville,Md to Discuss Analytical Testing Bases for Mark III ECCS Suction Strainer ML20216D8551998-04-14014 April 1998 Forwards Signed Original of Order Imposing Civil Monetary Penalty.Addl 5 Copies & Disk Encl,For Use.W/O Encl ML20217B8441998-03-0606 March 1998 Notification of Cancellation of 980331 Meeting in Rockville, MD to Discuss Proposed Testing Program for ECCS Suction Strainer ML20197B7831998-03-0606 March 1998 Notification of 980331 Meeting W/Ceic in Rockville,Md to Discuss Proposed Testing Program for ECCS Suction Strainer. (Proprietary Info Will Be Discussed) ML20199A3071997-11-13013 November 1997 Forwards NRC Operator Licensing Exam Rept (Included Completed & Graded Tests) for Tests Administered During Wk of 970825 ML20199A3291997-11-13013 November 1997 Forwards NRC Operator Licensing Exam Rept 50-440/97-309OL on 970825-30 w/as-given Written Exam ML20138D8451997-04-29029 April 1997 Notification of 970508 Meeting W/Clei in Rockville,Md to Discuss Priorities & Schedules of Licensing Issues for Plant ML20147J2271997-04-10010 April 1997 Forwards for Transmittal Notice of Proposed Merger for Perry Nuclear Power Plant,Unit 1 ML20136F9741997-03-13013 March 1997 Notification of 970324 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md to Discuss Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept & to Discuss Acoustic Methodology Applied to Upper Lift Load ML20135E4781997-03-0505 March 1997 Notification of 970306 Meeting W/Cleveland Electric Illuminating Co in Rockville,Md to Review Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept.Meeting Cancelled ML20134Q1271997-02-25025 February 1997 Notification of 970306 Meeting W/Util in Rockville,Md to Review Emergency Core Cooling Sys Suction Strainer 1/4 Scale Test Rept & to Discuss Acoustic Methodology Applied to Upper Lift Load Reduction ML20138J7671997-02-0505 February 1997 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licenseing Exam on 970409. Ltr W/Copy to Chief,Operator Licensing Branch Must Be Submitted to Listed Address in Order to Register Personnel ML20134P9011996-11-26026 November 1996 Notification of 961204 Meeting W/Clei & Teco in Rockville,Md to Discuss Potential Submittals Concerning Proposed Merger of Centerior Energy Co & Oec ML20134E9191996-10-29029 October 1996 Forwards Rationale for Inital Plants Selected for Design Insps & for Plants Considered for Second Quarter FY97 Design Insps ML20149E8161994-08-0202 August 1994 Forwards Fr Notice of License Amend Requests Proposed Merger of Toledo Edison Co & Cleveland Electric Illumianting Co Antitrust Determination NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20059E5031994-01-0606 January 1994 Forwards Results of on-site EQ Review of Related Info at Plant in Support of Staff Task Action to Identify & Address Existing EQ Issues & Concerns.Encl 1 Provides Results of Staff Review.Encl 2 Provides Draft Ltr to Transmit Info ML20058N4811993-12-15015 December 1993 Informs of Decision to Expand Senior Mgt Oversight of Selected Plants,Per Recent Meeting W/J Martin & H Miller. Lists Assignment of Managers,Effective Immediately ML20058M0351993-12-13013 December 1993 Notification of 931214 Meeting W/Licensee in Rockville,Md to Discuss Plant Fuel Failure Root Cause Analysis ML20057G3001993-10-15015 October 1993 Notification of 931028 Meeting W/Util in Rockville,Md to Discuss Plant Course of Action Plan to Improve Performance of Plant Over Next Several Yrs ML20057D5251993-09-0101 September 1993 Forwards 2.206 Petition Submitted by Capella,Wene & O'Connell Re Poor Performance of Plant.W/O Encl ML20056G0181993-08-26026 August 1993 Notification of 930902 Meeting W/Util in Rockville,Md to Discuss Facility IST ML20056E7141993-08-19019 August 1993 Notification of 930831 Meeting w/BWR-6 Owners Group in Rockville,Md to Discuss Pending Amend Submittals to Adopt Improved Standardized TS ML20062C2851990-10-18018 October 1990 Forwards Stipulation of Agreed Facts Between Licensee,Nrc Staff & Ohio Citizens for Responsible Energy, Signed by Three Parties.Original Stipulation Returned to Silberg. W/O Encl ML20059M0271990-09-17017 September 1990 Forwards Amend to Facility License,Removing cycle-specific Parameters from Tech Specs.W/O Encl ML20059H2091990-09-0505 September 1990 Provides Recipients & Hiatt W/Util Proposed Amend to Delete Values of cycle-specific Parameters of Each Core from Tech Specs ML20056A3641990-07-24024 July 1990 Requests Addition of Listed Name to Svc List for Plant Proceeding.W/Certificate of Svc.Served on 900726 ML20248D1391989-09-25025 September 1989 Forwards AEOD/T915, Ground Fault Detection & Trip Circuit at Perry Unit 1, Technical Review Rept.No Further AEOD Action Recommended,Based on Merits of Alarm Scheme for Resolution of Issue ML20248B5631989-06-0606 June 1989 Forwards,For Info,Aeod Diagnostic Evaluation Team Rept for Plant.Evaluation Initiated Following Discussions Held During Senior Managers Meeting in Dec 1988 ML20247E5711989-05-22022 May 1989 Notification of 890531 Meeting W/Util in Rockville,Md to Discuss Monthly Performance Rept ML20246L2701989-05-0909 May 1989 Forwards SALP Inputs for SALP 9 Rept,Including Info Obtained During Exams Reported in Exam Repts 50-440/OL-88-01 & 50-440/OL-88-02.Deficiencies Noted Re Failure to Provide Training on Auxiliary & Emergency Sys ML20246A2771989-05-0303 May 1989 Forwards SALP Input for May 1988 - May 1989,in Accordance W/ 890401 Memo ML20236E3261989-03-20020 March 1989 Forwards Assessment & Tech Spec Clarification Re 881212 Loss of 5-volt Dc Power Supply & Loss of Rod Display & Operator Control Modules.Restoration of Normal Rod Position Indication,Rather than rod-by-rod Indication,Proper ML20235S6271989-02-28028 February 1989 Notification of 890307 Meeting W/Bwr Owners Group in Rockville,Md to Discuss Items of Current Interest.Agenda Encl ML20206C6041988-11-0808 November 1988 Discusses Review of 870227 Significant Precursor Event Re Two Inoperable Diesel Generators,Per R Dudley 881013 Note. Util Corrective Actions Appear Thorough & Comprehensive ML20205T5821988-11-0707 November 1988 Notification of 881115 Meeting W/Devonrue & Util in Rockville,Md to Discuss Proposed Std Alternate AC Design to Meet Station Blackout Rule ML20155J3931988-10-20020 October 1988 Notification of 881102 Meeting W/Util in Rockville,Md to Discuss Unit 1 Operating Performance.Proposed Agenda Encl 1999-09-15
[Table view] |
Text
,
- c. .. :
- +-.. i n s. *% 3*
'il .i -
]h w% : w.m(. s k, .
.i 4
[yf'P.j g-9 .,g..'n 1. [ mi ,'u'
, UNITED ETATES i'.
..bPb:.}m J[ ,
ef kRi $f?
9 . . .'
i $ f0!dN Nai!S $g g3 .3sihe E -
5 L .r
$ ' . .i . '. .' g lib i .
' ' -l, ..iblUCLEAR REGU' ATORv COMMISSION.
' WASHINGTON,0.Cs .20555' /.
- \,"""' - f L,.; rM.4YJMM ' :.v '
9 .#$.... W' ?i f)'fpYq"k F.qMGig# igm!
WQ%lNfM.
N.% % 9? W ' . ~ .
e :.
h~l . ' \ 1%'] '
- . c wh
~ b. ., ; !
- 8. ,. &; Wp
. Q .3 ,
PDii1 d-5I Lcd,37 m.4 A M A" fu em 7
\. W ~ ) .
- y,,. . ;;
mace- ng (ta. (m,bu.QM
? +. .
fA+ w ( ,
&& [ ;
\ svb n c.1k'W I
h AN. cGAJ :.% n ,
A A P D4' ; ~ o
.s
^
s j Ylj6Eh ,
[E N a ,
j ;,g . g .;
-g g .g S- O ) t t)-) if N 6
(?c ) .
.f
+. ,
$-gC '9
)
4 s.* .
. *?
^
N..' ' M , , 'w R q$$i'NY g.,V.h e
)
y *we } !
.X3735l
.i 8706040041 070527 PDR NUREG
',..* 1147 C PDR -
,! I g s a p
)
, 4 I . j ' i e
>. . . .,3 s ,. . q' - :.(, . . , . wa 4 : , ; ,. . .f .m. y y h .'-
i ; p R if 4;" g.
d.f,:'44 ; ,
>' ,. . .'J .. . g 9 ' ,
l @ Ar, ! > 's,*
- ., '.
. i t.i
,,' hr. k . .As Y o rc, ,m. t fl y .
g 4'$ '44' I
i ) ,'( ,f '4 # 'l '
'f ' I' f t . ,
+ - d.
+ .. - . -
[..
C
( REFERENCES.
- 1. ' M. P. . Bohn et al., " Application of the SSMRP Methodology to the
- Seismic' Risk at .the ' Zion Nucl' ear Power ' Plant," Lawrence' Livermore
-National Laboratory, NUREG/CR-3428, UCRL-53483, January'1984.
2.: Power Authority of the. State of New York, " Indian Point Probability.
Safety Study," Vols. 1-12, 1982.
- 3. Comonweal th Edison Company, " Zion Probability Safety Study,'?
- Pickard, Lowe, and Garrick, 1983.
- 4. NUC Corporation,. " Limerick Generating Station Severe Accident Risk-
, Assessment," 1981.
- 5. Northwest Utilities', " Millstone Unit 3 Probabilistic Safety Study,"
Vols.1-12, August 1983.
- 6. Nuclear Safety Analysis Center, EPRI, "Oconee PRA: A Probabilistic Risk Assessment of Oconee Unit 3," June 1981.
- 7. J. Garrick et al., Seabrook Station PRA, PLG-0365, June 1984 N . Memorandum :from H.. R. Denton to -R. B. . Minogue,
Subject:
NRR -
( y' Research .Needs in . Seismic . Analysis' Methodol.ogy (RR-NRR-82-2), dated April 8, 1982.*
c R. Denton to E. S. Beckjord,
Subject:
Generic w h Memorandum from H.
Odestions Stemming from the Ohio Earthquake of January 31, 1986, dated October 3, 1986.*
yo 10.J. Memorandum- from H. .R. Denton to R.. B. Minogue,
Subject:
NRR Input J for the Long-Range Research Plan (LRRP), FY 1986-1990, dated j
December 6, 1984.*
- % 11. Memorandum from J. J. Ray (ACRS Chainnan) to N. J. Palladino,
Subject:
Quantification of Seismic Design Margins, dated January 11, 1983.*
N 12. Memorandum from J. C. Ebersole (ACRS Chairman) to N. J. Palladino,
Subject:
Quantification of Seismic Design Margins, dated January 18, 1984'*'
}
Available in the NRC Public Document Room,1717 H Street NW., Washington, DC.
Ref-1 H- ~~ 1 n.F .- eout m M e.. - m . ,. it 4 s h ):
w
'. o -. y
.w f
(' N: 13.1 Memorandum from 7W. J. ; Dir'cks to . J. . .C.. Ebersole .(ACRS . Chainnan),e
~ S'ubject:c - Qua'ntificationf of -Seismic'. Design Margins. dated. April ~ 12,f r1984.*'
. . . .a
~
N I Memorandum i from W..'J. !Dircks to N."J. . Palladino,
Subject:
Quanti-h, Y fication of Seismic Design Margins, dated April 12, 1984.*
9 15.. SECY-86-162 (Po'licy Issue. Paper),
Subject:
Treatment of External Events in the . Implementation' of the Severe. Accident Policy Statement,. dated May 22, 1986.*
N 16. Letter from J. F. Devine,- USGS, to R. E. Jackson, NRC, ' dated November 18, 1982.*
N 17. SECY-82-53 (Policy issue Paper), Subject,: Possible' Relocation of.
Design Contralling Earthquakes in the Eastern U.S., dated February 5, 1982.*
- 18. U.S. Nuclear Reguh tory Comission (USNRC), " Nuclear Plant Aging Research (NPAR) Program Plan," NUREG-1144, July 1985.
- 19. .R. J. Budnitz et al., "An Approach to the Quantification of Seismic Margins in Nuclear Power Plants," Lawrence Livermore National. Laboratory, NUREG/CR-4334, UCID-20444, August 1985.
I -
- 20. L. Griemann et al., "Probabilistic Seismic Resistance 'of' Steel Containments," Iowa State University, NUREG/CR-3127, January 1984.
r,m
_\n 1. USNRC, " Containment Integrity Research Program Plan," NUREG-1264, to be published.*
USNRC, " Piping Research Program Plan," NUREG-i222, to -be published.*
pH.
- 23. USNRC, " Report of _ the U.S. Nuclear Regulatory Commission Piping Review Comittee," f9 REG-1061, Vols.1-5, August 1984 - April 1985.
g % Letter from K. K. Bandyopadhyay, Brookhaven, to J. O'Brien, NRC, "An Evaluation Report on Damping Characteristics' of Motor Control Center and Switchgear by Use of low-Level Resonance Search Data," dated September 24, 1986.*
[N ' 25. Letter. from K. K. Bandyopadhyay, -Brockhaven, to J. 0'Brien, NRC, "An Evaluation Report .on . Dynamic Ampliffuation ~of Motor Control Cente'rs-and-Switchgears.,"~ dated December 4, 1986;*
Available in the NRC Public Document Room,1717 H Street NW., Washington, DC.
1
\ !
l Ref-2 l l
I
.x :: ,
4 k . .
- 26. .K. K. Bandyopadhyay ~ and C. H. .Hofmayer, " Seismic Fragility. of
- . Nuclear Power Plant' Components';(Phase 1)," Brookhaven . National Laboratory, NUREG/CR-4659..BNL-NUREG-52007, June 1986. '..
- 27. P. G. Prassinos et al. , '"Recomendations to the ' Nuclear ' Regulatory Comis'sion on Trial Guidelines for Seismic Margin Reviews of Nuclear
- Power Plants," Lawrence Livermore National Laboratory,
- NUREG/CR-4482, Draft for Coment, UCID-20579, March,1986.
-. l 3
f !
l 1 i j
i l
l Ref-3 4
4
, - . . . - . . , .-..m _ , .--..
]
l .
REFERENCES FOR APPENDIX G'
- 1. G; E. Cummings, J. J. ' Johnson, and 'R. J. Budnitz "NRC Seismic. Design Margins Program Plan," Lawrence Livemo.re National Laboratory, UCID-20247, October 1984.
- 2. R. J. Budnitz et al., "An Approach to the Quantification of Seismic Margins in Nuclear Power Plants," Lawrence Livermore National Laboratory, NUREG/CR-4334, UCID-20444, August 1985.
- 3. G. E. Cummings, " Summary Report on the Seismic Safety Margins Research Program " Lawrence Livermore National Laboratory, NUREG/CR-4431, UCID-20549, January 1986.
- 4. L. E. Cover et al., " Handbook of Nuclear Power Plant Seismic Fragili-ties," Lawrence Livermore National Laboratory, NUPEG/CR-3558, UCRL-53455, June 1985.
- 5. R. D. Campbell et al., " Compilation of Fragility Information from Avail-able Probabilistic Risk Assessments," Lawrence Livermore National Labora-tory, UCID-20571, September 1985.
- 6. P. G. Prassinos et al., " Recommendations to the Nuclear Regulatory Com-
' mission on Trial Guidelines for Seismic Margin Reviews of Nuclear Power Plants," Lawrence Livemore National Laboratory, NUREG/CR-4482, Draft for
.! Comment, UCID-20579, March 1986.
N 7. Letter from P. M. Sears, NRC, to J. P. Randazza, NYAPCo,
Subject:
Maine Yankee Atomic Power Station (MYAPS) Seismic Design Margins Program, dated March 26, 1987.*
- 8. Lawrence Livermore. National Laboratory, " Seismic Margin Review of the Maine Yankee Atomic Power Station," NUREG/CR-4826, Vols. 1-3, UCID-20948, March 1987.
N 9. SECY-86-162 (Policy Issue Paper),
Subject:
Treatment of External Events in the Implementation of the Severe Accident Policy Statement, dated May 22, 1986.*
- 10. Electric Power Research Institute (EPRI) Technical Report No. 1551.05,
" Evaluation of Nuclear Power Plant Seismic Margin," Draft, March 1987.
l Available in the NRC Public Document Room,1717 H Street NW., Washington, DC.
I G-10
. _ _ _ - . _